background image

EsiWelma Srl

 

URS20SL_en.doc - rev. 0 

Oxygen detectors – URS20SL 

20/10/2010 

Gas detection systems for industrial environments 

6/8

 

 

 

Electrical installation of 
the optional relay card 

 

Selecting the type of 
contact on the terminal 
board: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Configuring the relay 
operating mode:

 

After mechanically installing the relay card, it is necessary to configure it electrically, 
selecting the relay  operating mode and the type  of contact desired on the terminal 
board (NC or NO). 

A pair of extractable terminals is available for each relay; the type of contact (NC or 
NO) to be associated with them can be selected using the JP1…JP4 jumpers. 
 
NC or NO contact of pre-alarm relay 
NC or NO contact of 1

st

 THRESHOLD relay 

NC or NO contact of 2

nd

 THRESHOLD relay 

NC or NO contact of FAIL relay 

 

DL1 (yellow),   Sensor FAIL 

DL2 (red),  2

nd

 alarm THRESHOLD 

DL3 (red),  1

st

 alarm THRESHOLD

 

DL4 (red),   Pre-alarm  

 
Selecting the terminal contact: 
 
 
 

NC                         NO 

 
To  set  the  operating  mode  of  the  relays:  for  direct  (relay  energised  by  event)  or 
reverse (relay energised with no event), it is necessary to use the 6th selector of the 
DIP switch at S1; in particular: 

 
 

                                              direct operating mode  

reverse operating mode 

 

Checklist after 
mechanical and 
electrical installation 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

The  sensors  are  factory  calibrated  so  they  normally  do  not  require  any  other 
calibration once installed. Still, after installation, an operational check of the sensors 
is recommended. 
The detector will enter a 2-minute warm-up phase after power-up. 
After this time, the sensor will switch to normal operating mode, but it will take about 
2 hours before it reaches top performance level. 
When the detector is operating, a gas response check should be carried out using 
the TUL40.. gas calibration kit. This kit contains: 

-

  1  calibration  gas  cylinder:  4%  of  O

2

;  (see  kit  part  numbers  on  the  specific 

technical data sheet) 

-

  pressure valve and flow regulator 

-

  sensor body adapter 

-

  about 2 metres of hose between cylinder and adapter. 

During  the  test,  check  the  output  current,  the  status  of  the  LED  outside  the 
enclosure  on  the  sensor  body  and,  if  present  the  status  of  the  LEDs  on  the  relay 
card before closing the housing. 

The  LED  on  the  housing  and  the  4...20mA  output  have  the  following  operating 
meaning: 
 

Sensor status 

4...20mA Output 

Status LED on housing 

WARM-UP 

2mA 

Flashing at 2Hz frequency 

OPERATING 

4...20mA 

0,10,20mA for 

threshold 

applications 

1 flash about every 10 sec. 

PRE-ALARM 

2 flashes about every 5 sec. 

1

st

 ALARM THRESHOLD 

3 flashes about every 5 sec. 

2

nd

 ALARM THRESHOLD 

4 flashes about every 5 sec. 

SENSOR FAIL 

22mA 

Steady 

 

  D  |  C 

 

  B  |  A 

 

1   2   3   4   5   6   7   8 

ON 

1   2   3   4   5   6   7   8 

ON 

Содержание Sensigas URS20SL

Страница 1: ...d more in general where oxygen is stored Oxygen deficiency is an indirect measurement of the presence of other explosive or asphyxiant gases that deplete the oxygen in the air URS20SL sensors can be u...

Страница 2: ...t 1 or 2 thresholds 4 20mA Output reference selection 4mA 0 O2 20mA 30 O2 0mA no alarm 10mA 1 st threshold alarm 20mA 2 nd threshold alarm by jumper selectable polarity 4 20mA output load resistor up...

Страница 3: ...the excess oxygen as quickly as possible Oxygen deficiency Detection of oxygen deficiency has the purpose of indirectly detecting the presence of other gases that deplete the oxygen in the air theref...

Страница 4: ...chapter In order to change the default settings switch off the power supply input the new settings at the JP2 jumper circuit or at the S1 DIP switch as shown in the diagram then power up again in part...

Страница 5: ...below Step 1 Insert the connection slot provided with the relay card into the control card making sure the flexible tab is towards the main terminal board Find CN3 connector CN3 connector Connection...

Страница 6: ...trical installation The sensors are factory calibrated so they normally do not require any other calibration once installed Still after installation an operational check of the sensors is recommended...

Страница 7: ...ntenance return the sensor concerned to the supplier installer who in turn will send it back to the manufacturer Sensors may need to be re calibrated using the TUL40 calibration kit and the TUS40 20 h...

Страница 8: ...r industrial environments 8 8 Installation data To be filled in by Installer Installer s stamp and signature Installation site Product order number Part Number Manufacturing date Installation date Rep...

Отзывы: