G8872_1 Installation Manual AUS
11
Annual service procedure:
1. Isolate power to fire.
2. Remove front glass and clean inside of glass.
3. Remove logs and brush off any soot.
4. Remove burners and blow compressed air through them.
5. Remove jets and clean injector hole with solvent.
6. Remove firebox to give access to fan, brush and vacuum any
dust build up from fan blades.
7. Vacuum any dust from the cavity that houses the fan and
solenoid valves and from the ducts down each side of the heater
that lead to this cavity.
8. Test all joints for gas tightness.
9. Reassemble heater and check that operating pressure is correct.
2.3KPa LPG, 0.87KPa Natural Gas.
10. Check glass & Firebox tape and replace if necessary.
11. Check to make sure that flue system is intact, not in any way
blocked and that flue system is drawing correctly.
12. Trial heater with several start/stop cycles and trial fan-boost,
effect only and thermostat modes to ensure that all modes
function correctly.