background image

6

INSTRUCTIONS

POST ASSEMBLY

Figure 3

3

2

Be sure to match up both 

“Back Side” stickers on 

the back of the poles and 

that the holes on top pole 

are toward the back.

DO NOT DUNK ON THIS UNIT . 

DO NOT HANG FROM ANY P

ART OF THIS 

UNIT , INCLUDING THE BACKBO

ARD, RIM, 

SUPPORT BRACES OR NET

4L-8152-00 

W

A

R

N

IN

G

 

!

42

42

Figure 4

  

DO NOT DUNK ON THIS UNIT . 

DO NOT HANG FROM ANY PART OF THIS 

UNIT , INCLUDING THE BACKBOARD, RIM, 

SUPPORT BRACES OR NET. 

4L-8152-01

WARNING 

!

NOTE:  Self Drilling screws 
(#42) are used.  Holes are 
only on outside Pole.  User 
must insert screws through 
BOTH POLES.

DO NOT DUNK ON THIS UNIT . 

DO NOT HANG FROM ANY PART OF THIS 
UNIT , INCLUDING THE BACKBOARD, RIM, 

SUPPORT BRACES OR NET. 

4L-8152-00 

W

ARNING

 

!

FAILURE TO FULLY ENGAGE THE 
BOTTOM OF THE UPPER POLE TO 
THE 6” MARK ON THIS BOTTOM 
POLE STICKER, COULD CAUSE 
YOUR UNIT TO COLLAPSE AND MAY 
RESULT IN SERIOUS INJURY OR 
PROPERTY DAMAGE. 

BACKSIDE 

Bottom  of  upper  pole  must  cover  the 
above  orange  portion  of  this  sticker 
(6” mark). 

WARNING 

!

4L-8151-00

3.

Once the Top pole is to the 6” Mark on the Warning Sticker, lay Pole Assembly on its side on two padded saw horses.  Insert 
a (#42) Screw into each 3/16” hole in top Pole, two on each side of the Post Assembly.  You will need someone to hold the 
Pole assembly while inserting screws.  Screw must go through both Top and Bottom (Inner) Poles.  Make sure to not strip 
screws once they are all they way through.  See 

Figure 4

.

SCREWS (#42) MUST BE INSTALLED TO POLE AS DESCRIBED 
IN STEP 3.  FAILURE TO INSTALL SCREWS COULD RESULT IN 

SERIOUS INJURY OR PROPERTY DAMAGE.

NOTE:  Cordless drill required for screw installation.  Do not over tighten screws causing screws to strip.  

Once Screw heads touch pole, STOP!  Overtightening will cause Pole to Warp and damage system.

NOTE:  To install screws, it will be easier if you use a cordless drill with 5/16” socket (instead of Phillips head).

NOTE:  Screws #42, used in step 3, are Self Drilling screws and can be installed without drilling pilot holes.  

However, it will be easier to install screws if you drill 9/64” pilot holes in bottom pole.  WEAR SAFETY 
GLASSES if drilling holes.

 

DO NOT DUNK ON THIS UNIT . 

DO NOT HANG FROM ANY PART OF THIS 

UNIT , INCLUDING THE BACKBOARD, RIM, 

SUPPORT BRACES OR NET. 

4L-8152-01 

WARNING 

!

1.

2.

Align the upper pole (#3) with the bottom pole (#2) as shown in 

Figure 3

 and slide them 

together.  While maintaining control of the pole assembly stand poles up 

STRAIGHT

 on a 

piece of MDF or plywood, 

lift poles up by bottom pole 

below the 6” mark shown on 

sticker and slam down the bottom pole as many times as needed on a piece of MDF or 
plywood 

until the bottom of the upper pole reaches the 6”

 mark (on Sticker) on the 

bottom pole.  

See Figure 3

.

Before putting any of the poles tubes together, make sure that the orange area of the 

Warning Sticker on Pole (#2) is 6 inches from the top end. 

Be sure that the “Back Side” 

stickers are on the back of the pole. 

See 

Figure 3.

If you want to see a video on how to put the poles together go to: 

http://www.escaladesports.com/customer-service/instruction-videos/basketball

WARNING: This pole assembly is heavy.  Step 2 may require two adults.  Make sure you 
can control the pole when slamming it together.  If you are unsure if you can safely control 
the pole ask another adult to help you.  This helper can stand on the opposite side of the 
pole.  Attention should be paid to one’s feet and toes during entire slamming process.

NOTE: 

When slamming poles together make sure to keep the poles

 straight.  

Slamming the poles down crooked will damage the bottom of the pole.  Top 
Pole must cover upper orange area of sticker.  If Pole goes slightly past the 6” 
mark, it is OK.

IMPORTANT! DO NOT hit poles with hammer or sledge hammer to 
attach poles together.

PIECE OF

PLYWOOD / MDF

(must be at least as 

big as pole plate)

BURY LINE

NOTE

: Top Pole must cover 

upper orange area of 
sticker.  If Pole goes slightly 
past the 6” mark, it is OK

.

Or Scan with your 

smart phone:

Содержание GOALIATH B2253

Страница 1: ...tighten them O W N E R S M A N U A L B2253 Please Do Not Return This Product T o The Store Contact Escalade Sports customer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Tol...

Страница 2: ...rom any part of the unit including the backboard rim support braces or net Do not slide climb or play on pole Keep organic material away from pole base Grass litter etc could cause corrosion and or de...

Страница 3: ...MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE BACKSIDE Bottom of upper pole must cover the above orange portion of this sticker 6 mark WARNING 4L 8151 00 Affixed to Bottom Post 3 Affixed to Top Post...

Страница 4: ...4 3 8 16 X 1 3 4 4 Pieces Hex Bolt 2 Pieces 10 X 1 10 Pieces 3 8 16 Lock Nut 14 pieces 1 2 13 Lock Nut 1 piece...

Страница 5: ...eter Court Hole Court Level 20 Diameter Court Top View Hole must be close to the Court without making contact Dig a round hole 32 deep and 16 in diameter at the top and 20 in diameter at the bottom of...

Страница 6: ...lips head NOTE Screws 42 used in step 3 are Self Drilling screws and can be installed without drilling pilot holes However it will be easier to install screws if you drill 9 64 pilot holes in bottom p...

Страница 7: ...ne person holds the pole in place have two other people finish pouring concrete up to court level Use a level to make sure Pole is vertical 6 Detail 1 P L A Y I N G S U R F A C E IMPORTANT BE SURE THA...

Страница 8: ...k pole with level to ensure that pole is vertical Figure 6 IMPORTANT Let concrete stand for a MINIMUM of 48 hours 2 days before proceeding to the next step In humid climates or wet weather allow addit...

Страница 9: ...3 Plastic Actuator Sleeve 15 and Steel Actuator 16 until equal amounts stick out through both sides of actuator See Figure 8 7 1 10 4 14 15 16 19 20 21 13 FAIL URE TO FUL LY ENG AGE THE BOT TOM OF THE...

Страница 10: ...bolt 22 two flat washers 18 two plastic washers 5 and one lock nut 4 See Figure 10 and Detail 3 Tighten both bolts 22 snug but do not over tighten Board Arms must pivot freely FA ILU RE TO FU LL Y EN...

Страница 11: ...of the backboard lower the backboard by turning the Actuator Crank until the lower arm makes contact with Stop Spacer 10 Figure 12 6 7 18 8 18 4 9 3 16 Stop Spacer 10 35 34 11 Figure 11 using a bolt...

Страница 12: ...ot point Snug is tight enough 22 Attach Upper Board Arms to upper mounting tubes on backboard using two bolts 24 two plastic washers 5 four washers 18 and two lock nuts 4 See Figure 13 NOTE Do NOT ove...

Страница 13: ...Note Tighten screws tight but do not over tighten Figure 14 Note Cordless drill recommended for screw installation Do not over tighten screws causing screws to strip Note To install screws it will be...

Страница 14: ...ce height decal on backside of steel actuator and line up the 16 10 ft mark on the tape with the 10 ft mark on the height decal Decal should fit correctly onto the backside of the steel actuator If no...

Страница 15: ...not cover the Warning Label on the front of the pole with the Pole Pad should cover Post Screws but remain below Warning Label on front of the Pole See Figure 18 Make sure to repostion Pole Pad if Sl...

Страница 16: ...the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty shall not apply in an...

Страница 17: ...7540 01 This Manual 1 3M 6899 00 48 Board Pad Right 1 3M 6900 00 48 Board Pad Left 1 3M 6901 02 3F 6010 00 Net 1 3 8 16 x 1 3 4 Carriage Bolt 4 Not Used 1B 7039 00 Self Tapping Screw 10 x 1 10 B2253...

Страница 18: ...2 18 5 4 22 4 10 7 10 4 24 18 18 18 26 4 Pre Installed 42 40 27 32 33 42 17 39 2L 7540 01 18 34 30 Pre Installed DO NO T DU NK ON TH IS UN IT DO NO T HA NG FR OM AN Y PA RT OF TH IS UN IT INC LU DIN...

Отзывы: