INSTALLATION  TIMELINE

PART 1

Day 1.

Post assembly, pour concrete, set post and

Day 2.

Allow concrete to cure.

PART 2

Day 3.

Complete  Goaliath

®

  assembly  instructions.  (Requires

3-4 adults)

Before  digging  hole  for  your  system,  check  for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury!  Contact your local utility company if unsure.

Note: For best results with less vibration, your system
should  be  independent  of  court.  If  pouring  concrete  for
both at same time, add an expansion joint in between.

2.

1.

Determine  the  location  of  the  hole.
The proper location is as close to the
court  without  making  contact,  as
shown  in

Figure  1

.  This,

however, is a general rule.
If  you  need  to  locate  the
hole  in  a  location  other  than  this,  use
the  following  dimensions  as  a  guide.

Overhang when adjusted to 10 ft. = 19 1/4”

2.  Vertical main post assembly is a two part process.

1.  Prior to pole installation and goal assembly, call utility services for location of underground utility lines before you dig.

POST INSTALLATION INSTRUCTIONS (Day 1)

32"

16"

Diameter

Court

Hole

Court Level

20” Diameter

Court

Top View

Hole must be close to 

the Court without 

making contact.

Dig a round hole 32” deep and 16” in diameter at 

the top and 20” in diameter at the bottom of the hole. 

If you live in an area where frost heaves may pose a 

problem, consult your local building inspector to 

determine the proper hole depth. See 

Figure 1

.

16"

3.

Place and center a masonry block in the bottom of the 

hole so there is exactly 16” from the playing surface to 

the top of the masonry block. See 

Figure 2

.

Figure 2

Hole

Masonry

Block

Allow concrete to cure.

18 INCH

MINIMUM

REAR

CLEARANCE

REQUIRED

Note: When digging hole, if you hit rock 
and cannot dig through contact a contractor.

Note: Minimum of 18” rear clearance is required behind pole.

ITEMS NEEDED (not included)

9-
1-
1-
1-
1-
1-
6-
2-
1-
1-
1-
1-
1-
1-
1-

50 lbs bags of concrete (2-3 Extra Recommended)
Post hole digger (optional)
Wheel barrow
Garden hose
Level
Tape Measure
2X4’s
50 lbs sand bags
Standard masonry block
9/16”, 3/4” & adjustable wrench
Cordless drill & 9/64” drill bit
5/16” socket driver (for cordless drill)
Pair of Safety Glasses
Phillips Screwdriver
Ladder

*Tip: It is always a good idea to purchase two or three 

extra bags of concrete, just in case you need them.  If 
extra bags are not used you can return them to the store.

Содержание GOALIATH B2253

Страница 1: ...tighten them O W N E R S M A N U A L B2253 Please Do Not Return This Product T o The Store Contact Escalade Sports customer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Tol...

Страница 2: ...rom any part of the unit including the backboard rim support braces or net Do not slide climb or play on pole Keep organic material away from pole base Grass litter etc could cause corrosion and or de...

Страница 3: ...MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE BACKSIDE Bottom of upper pole must cover the above orange portion of this sticker 6 mark WARNING 4L 8151 00 Affixed to Bottom Post 3 Affixed to Top Post...

Страница 4: ...4 3 8 16 X 1 3 4 4 Pieces Hex Bolt 2 Pieces 10 X 1 10 Pieces 3 8 16 Lock Nut 14 pieces 1 2 13 Lock Nut 1 piece...

Страница 5: ...eter Court Hole Court Level 20 Diameter Court Top View Hole must be close to the Court without making contact Dig a round hole 32 deep and 16 in diameter at the top and 20 in diameter at the bottom of...

Страница 6: ...lips head NOTE Screws 42 used in step 3 are Self Drilling screws and can be installed without drilling pilot holes However it will be easier to install screws if you drill 9 64 pilot holes in bottom p...

Страница 7: ...ne person holds the pole in place have two other people finish pouring concrete up to court level Use a level to make sure Pole is vertical 6 Detail 1 P L A Y I N G S U R F A C E IMPORTANT BE SURE THA...

Страница 8: ...k pole with level to ensure that pole is vertical Figure 6 IMPORTANT Let concrete stand for a MINIMUM of 48 hours 2 days before proceeding to the next step In humid climates or wet weather allow addit...

Страница 9: ...3 Plastic Actuator Sleeve 15 and Steel Actuator 16 until equal amounts stick out through both sides of actuator See Figure 8 7 1 10 4 14 15 16 19 20 21 13 FAIL URE TO FUL LY ENG AGE THE BOT TOM OF THE...

Страница 10: ...bolt 22 two flat washers 18 two plastic washers 5 and one lock nut 4 See Figure 10 and Detail 3 Tighten both bolts 22 snug but do not over tighten Board Arms must pivot freely FA ILU RE TO FU LL Y EN...

Страница 11: ...of the backboard lower the backboard by turning the Actuator Crank until the lower arm makes contact with Stop Spacer 10 Figure 12 6 7 18 8 18 4 9 3 16 Stop Spacer 10 35 34 11 Figure 11 using a bolt...

Страница 12: ...ot point Snug is tight enough 22 Attach Upper Board Arms to upper mounting tubes on backboard using two bolts 24 two plastic washers 5 four washers 18 and two lock nuts 4 See Figure 13 NOTE Do NOT ove...

Страница 13: ...Note Tighten screws tight but do not over tighten Figure 14 Note Cordless drill recommended for screw installation Do not over tighten screws causing screws to strip Note To install screws it will be...

Страница 14: ...ce height decal on backside of steel actuator and line up the 16 10 ft mark on the tape with the 10 ft mark on the height decal Decal should fit correctly onto the backside of the steel actuator If no...

Страница 15: ...not cover the Warning Label on the front of the pole with the Pole Pad should cover Post Screws but remain below Warning Label on front of the Pole See Figure 18 Make sure to repostion Pole Pad if Sl...

Страница 16: ...the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty shall not apply in an...

Страница 17: ...7540 01 This Manual 1 3M 6899 00 48 Board Pad Right 1 3M 6900 00 48 Board Pad Left 1 3M 6901 02 3F 6010 00 Net 1 3 8 16 x 1 3 4 Carriage Bolt 4 Not Used 1B 7039 00 Self Tapping Screw 10 x 1 10 B2253...

Страница 18: ...2 18 5 4 22 4 10 7 10 4 24 18 18 18 26 4 Pre Installed 42 40 27 32 33 42 17 39 2L 7540 01 18 34 30 Pre Installed DO NO T DU NK ON TH IS UN IT DO NO T HA NG FR OM AN Y PA RT OF TH IS UN IT INC LU DIN...

Отзывы: