INSTALLATION TIMELINE
PART 1
Day 1.
Post assembly, pour concrete, set post and
Day 2.
Allow concrete to cure.
PART 2
Day 3.
Complete Goaliath
®
assembly instructions. (Requires
3-4 adults)
Before digging hole for your system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.
Note: For best results with less vibration, your system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.
2.
1.
Determine the location of the hole.
The proper location is as close to the
court without making contact, as
shown in
Figure 1
. This,
however, is a general rule.
If you need to locate the
hole in a location other than this, use
the following dimensions as a guide.
Overhang when adjusted to 10 ft. = 19 1/4”
2. Vertical main post assembly is a two part process.
1. Prior to pole installation and goal assembly, call utility services for location of underground utility lines before you dig.
POST INSTALLATION INSTRUCTIONS (Day 1)
32"
16"
Diameter
Court
Hole
Court Level
20” Diameter
Court
Top View
Hole must be close to
the Court without
making contact.
Dig a round hole 32” deep and 16” in diameter at
the top and 20” in diameter at the bottom of the hole.
If you live in an area where frost heaves may pose a
problem, consult your local building inspector to
determine the proper hole depth. See
Figure 1
.
16"
3.
Place and center a masonry block in the bottom of the
hole so there is exactly 16” from the playing surface to
the top of the masonry block. See
Figure 2
.
Figure 2
Hole
Masonry
Block
Allow concrete to cure.
18 INCH
MINIMUM
REAR
CLEARANCE
REQUIRED
Note: When digging hole, if you hit rock
and cannot dig through contact a contractor.
Note: Minimum of 18” rear clearance is required behind pole.
ITEMS NEEDED (not included)
9-
1-
1-
1-
1-
1-
6-
2-
1-
1-
1-
1-
1-
1-
1-
50 lbs bags of concrete (2-3 Extra Recommended)
Post hole digger (optional)
Wheel barrow
Garden hose
Level
Tape Measure
2X4’s
50 lbs sand bags
Standard masonry block
9/16”, 3/4” & adjustable wrench
Cordless drill & 9/64” drill bit
5/16” socket driver (for cordless drill)
Pair of Safety Glasses
Phillips Screwdriver
Ladder
*Tip: It is always a good idea to purchase two or three
extra bags of concrete, just in case you need them. If
extra bags are not used you can return them to the store.