
P R E P A R I N G T H E S Y S T E M
MyLab
- G E T T I N G S T A R T E D
4 - 2
Connecting Peripherals
Peripherals, that have been ordered simultaneously with
MyLab
, are usually
already mounted and connected. The first mounting and connecting will
usually be performed by an Esaote technician.
NOTE
Esaote suggests to contact its Service representative to install any auxiliary
device.
Before installing the peripheral devices, make sure that
MyLab
is switched off
and unplug the power cable from the mains outlet. Brake the wheel to fix
MyLab
.
How to connect peripheral devices:
1. Ensure that the
MyLab
is switched off (complete shut down
not stand-by or other conditions).
2. Connect the peripheral device to the
MyLab
.
3. Switch the peripheral device on, making sure that the device
is not in stand-by condition.
4. Switch the
MyLab
on by pressing the Power ON button.
NOTE
Always observe the instructions given in the manual of the peripheral/
auxiliary device.
NOTE
Contact Esaote personnel for recommended USB printers and for safe and
proper installation.
NOTE
Not all the external monitors are compatible with
MyLab
. Please contact
your Service representative to select an external monitor that can be
managed by
MyLab
.
Safety Concept
MyLab
trolley can be equipped with an insulation transformer to provide
required separation from AC mains for both
MyLab
and the auxiliary devices.
Additional equipment connected to
MyLab
must comply with respective IEC
or ISO standards (e.g. IEC 60950 for data processing equipment).
Furthermore, all configurations shall comply with the requirements for
medical electrical systems (see IEC 60601-1-1 or clause 16 of the 3rd Edition
of IEC 60601-1, respectively).
Anybody connecting additional equipment to medical electrical equipment
configures a medical system and is therefore responsible that the system
Содержание MyLabSigma elite
Страница 1: ...Rev 05 June 2021 MyLabSigma elite GETTING STARTED 350061100...
Страница 2: ...MyLab G E T T I N G S T A R T E D ii...
Страница 5: ...MyLab G E T T I N G S T A R T E D v GETTING STARTED RED Declaration of Conformity...
Страница 6: ...MyLab G E T T I N G S T A R T E D vi...
Страница 12: ...I N D E X MyLab G E T T I N G S T A R T E D xii Standards 9 6...
Страница 24: ...I N T R O D U C T I O N MyLab G E T T I N G S T A R T E D 1 12...
Страница 44: ...A D D I T I O N A L I N F O R M A T I O N O N S A F E T Y MyLab G E T T I N G S T A R T E D 2 20...
Страница 120: ...P E R F O R M I N G A N E X A M MyLab G E T T I N G S T A R T E D 7 10...
Страница 134: ...T E C H N I C A L S P E C I F I C A T I O N S MyLab G E T T I N G S T A R T E D 9 8...