-- 45 --
fzb2d3ea
Example 1
System1
(PEH1 and Welding power source no. 1)
System2
(PEH2 and Welding power source no.2)
Weldhead offset
S
Press start for both
PEH1
and
PEH2
at the same time.
S
System1
starts welding.
System2
doesn’t start welding until it has reached the starting point for
System1
(the distance is set in “Weldhead offset”).
S
Press stop for both
PEH1
and
PEH2
at the same time.
S
System1
stops welding while the travel motion continues.
System2
stops welding when it has reached the point where
System1
stopped
welding (the distance is set in “Weldhead offset”).
S
The weld is finished.
Example 2
When using a remote control box (RCC) the two systems must be connected to each
other (see manual
A2- A6 Process Control System
article no. 0458 081 074).
System 1
System 2
bus
bus
DIG I/O 1
DIG I/O 2
D7
C2
When using an RCC one can when necessary use only Welding power source 2.
S
Set “Weldhead offset” to 0 in the menu for
PEH2
.
S
Press start for Welding power source 2 on the RCC.
System1
starts to move and
System2
starts to weld
S
Press stop for Welding power source 2 on the RCC to finish.
GB
Содержание PEH 4.3
Страница 10: ...10 fzb2d1ea GB...
Страница 14: ...14 fzb2d2ea 4 CONNECTION DIAGRAM GB...
Страница 15: ...15 fzb2d2ea GB...
Страница 16: ...16 fzb2d2ea 5 COMPONENT POSITIONS ON CIRCUIT BOARD AP2 GB...
Страница 17: ...17 fzb2d2ea 6 COMPONENT POSITIONS ON CIRCUIT BOARD AP1 GB...