The installation must be carried out by a professional.
NOTE!
Mains supply requirements
High power equipment may, due to the primary current drawn from the mains
supply, influence the power quality of the grid. Therefore connection restrictions or
requirements regarding the maximum permissible mains impedance or the required
minimum supply capacity at the interface point to the public grid may apply for some
types of equipment (see "TECHNICAL DATA" chapter). In this case it is the
responsibility of the installer or user of the equipment to ensure, by consultation with
the distribution network operator if necessary, that the equipment may be
connected.
4.1
Lifting instruction
The power source is lifted by the handle or by the shoulder strap, supplied with the power
source. The strap is fastened as shown in the picture below.
4.2
Location
Position the welding power source such a way that its cooling air inlets and outlets are not
obstructed.
4.3
Mains power supply
Check that the unit is connected to the correct mains power supply voltage, and that it is
protected by the correct fuse size. A protective earth connection must be made, in
accordance with regulations.