Cabling 

 
 

1/1531-HSD 101 41 Uen A   2004-01-30

 

5

 

 

3.1.2 

Wiring EDGE Connectors 

It is recommended to follow the “Best practice” wiring procedure when 
wiring the EDGE connectors. 

The EDGE connector can be mounted by using a Tool Kit. The kit consists 
of a wiring bracket-tool and an LSA+ inserter-tool.  Figure 3 on page 5 
shows how to mount the wiring bracket-tool on the rods in a subrack.  

 

 

Figure 3 

Mounting the Wiring Bracket-Tool 

 

The EDGE connectors must be mounted as shown in Figure 4 on page 6. 
The wiring bracket-tool ensures that the cables are long enough so that the 
IP DSLAM can be dismounted by pulling it out. In case the wiring bracket-
tool is not used, it is important to ensure that the cables are long enough. 

 

 

 

Содержание EDN312

Страница 1: ...EDN312 Installation Guide Ethernet DSL Access IP DSLAM...

Страница 2: ...t owner The contents of this document are subject to revision without notice due to continued progress in methodology design and manufacturing Ericsson shall have no liability for any error or damage...

Страница 3: ...Cabling 4 3 1 Cabling of Subscriber Lines 4 3 1 1 Cabling Lines 4 3 1 2 Wiring EDGE Connectors 5 3 2 Cabling of Ethernet Connections 8 4 Mounting the IP DSLAM 9 5 Verifying the Installation 10 5 1 Ver...

Страница 4: ......

Страница 5: ...should have a basic understanding of the Internet Protocol IP The guide can be read separately but for a full understanding of the EDA system the reader is referred to the System Overview The guide c...

Страница 6: ...n The operation class 3 2 means tested for partly temperature controlled location Caution The temperature within a rack assembly may be higher than the ambient room temperature Check that the rack env...

Страница 7: ...1531 HSD 101 41 Uen A 2004 01 30 3 The distance between the IP DSLAMs must be at least 20 mm so that an IP DSLAM can be dismounted without interfering with the adjacent IP DSLAMs Figure 1 Space Requir...

Страница 8: ...ions between the Line MDF and Exchange MDF through the EDGE connectors Figure 2 on page 4 shows the subscriber line connections through the EDGE connectors both for exchange and line side Exchange EDG...

Страница 9: ...acket tool and an LSA inserter tool Figure 3 on page 5 shows how to mount the wiring bracket tool on the rods in a subrack Figure 3 Mounting the Wiring Bracket Tool The EDGE connectors must be mounted...

Страница 10: ...g the EDGE Connectors Strip approximately 20 cm off the new cable and tie it up with a cable tie to the existing cable as illustrated in Figure 5 on page 7 Alternatively make a loop around the cable g...

Страница 11: ...acing the Insertion tool above the slit place the cutting end towards the connector s center and firmly press towards the connector Repeat this step for all wires Figure 6 Cutting and Connection a Wir...

Страница 12: ...must not exceed 8 5 one cable one way when the ECN310 switch and or the ECN320 switch is used When EPN124 power nodes are used the resistance must not exceed 10 and ECN320 one cable one way The length...

Страница 13: ...through the EDGE connector have been pulled The EDGE connector is removed from the bracket tool and inserted in the rear of the IP DSLAM The IP DSLAM has been labelled with line on one side and exchan...

Страница 14: ...r any management system 2 Verification using the Local Craft Tool LCT 3 Verification using PEM 5 1 Verification without Connection to PEM It is not possible to activate the IP DSLAM by this method It...

Страница 15: ...received an IP address and SW Verify if possible that the ECN320 switch port where the IP DSLAMs are connected indicates active Ethernet connection Active Ethernet connection is verified Recommended...

Страница 16: ...restarted from the CLI LCT ECN320 Step 1 Copy default cfg files to LCT Step 2 Copy new cfg files to ECN320 Step 5 Copy default cfg files back to ECN320 cfg_1 cfg_2 cfg_24 cfg_1 cfg_2 cfg_24 cfg_1 cfg_...

Страница 17: ...PEM User s Guide for detailed information of how to use them Table 3 Verification with the ECN320 Local Craft Tool Verification Activity Comments Perform continuity check on each line from the Exchan...

Страница 18: ...1553 AOM 901 018 3 Ericsson AB 2004 EDN312 User s Guide 1 1553 HSD 101 41 Ericsson AB 2004 Subrack Installation Guide 1 1531 HSC 901 026 4 Ericsson AB 2004 Outdoor Cabinet Installation Guide 1531 1 BF...

Страница 19: ......

Страница 20: ...Ericsson AB Ericsson AB 2004 All Rights Reserved www ericsson com 1 1531 HSD 101 41 Uen A 2004 01 30...

Отзывы: