
List of contents
1 Technical data
5
1.1 Strapping system
5
1.2 Sealing head
6
1.3 Charger, battery, battery change trolley
8
2 General
9
2.1 Notes on environmental protection
10
3 Safety regulations
11
3.1 Safety regulations for operation of strapping system
11
3.2 Safety regulations for charger and battery-pack
17
4 Description
18
4.1 Design
18
4.2 Control panel of strapping system
19
4.3 Control panel sealing head
19
4.4 Indications of the Dual charger
20
4.5 Safety band switches
21
5 Installation
22
5.1 Lifting and unloading of the machine
22
5.2 Battery charger
23
5.3 Charging the battery-pack
23
5.4 Fuses of the battery -pack
25
6 Operation
26
6.1 Setting of strap width at the sealing head
26
6.2 Switching on the control unit
27
6.3 Choosing the correct tension force/ range
28
6.4 Setting the tension force at the sealing head
29
6.5 Setting mode of operation of the sealing head
31
6.6 Favorit wählen
32
6.7 Setting the welding time
33
6.8 Loading / changing the strap coil
34
6.9 Setting pallet width
41
6.10 Setting and saving of strapping height
46
6.11 Strapping
47
6.12 Tensioning and welding
54
6.13 Sealing control
58
Page
-4-