Maintenance 7. Arm #3
G3 Rev.14
123
Joint #3 motor
Installation
(1) Mount the pulley and brake hub to the Joint #3
motor.
Insert the brake hub until it touches the end face
of motor shaft and secure the hub.
Be sure to fit the end face of the pulley to the
brake hub.
Tighten one of the set screws on the flat face of
the motor shaft until the screw just touches the
surface.
Joint #3
motor
Bush: M5
Set screw:
2-M5
×
8
Pulley
2-M4
×
10
Brake hub
Insert a bushing into the other set screw hole to prevent damage to the motor shaft.
(2) Mount the Z plate to the Joint #3 motor.
Screw : 4-M4
×
10
(3) Pass the Z belt of Joint #3 motor unit through the
ball screw spline.
Place the belt around the pulley.
Make sure that the gear grooves of the belt are fit
into those of the pulleys completely.
Z1 pulley
Z belt
(4) Move the Joint #3 motor unit and spline upper
rotator part downwards together and put them on
the Arm #2 upper side.
Be sure to keep the belt on the pulley.
(5) Loosely secure the Joint #3 motor unit to Arm #2.
Check that the motor unit can be moved by hand, and it will not tilt when pulled.
If the unit is secured too loose or too tight, the belt will not have the proper tension.
(6) Place the U1 belt around the pulley.
Place the Joint #4 motor unit on the Arm #2
upper side.
3-M4
×
12 + washer
Joint #4
motor unit
3-M4
×
12 + washer
Joint #3 motor unit
Joint #4
intermediate
shaft
3-M4
×
12
+ washer
NOTE
Содержание G3 Series
Страница 1: ...Rev 14 EM183R3623F SCARA ROBOT G3 series MANIPULATOR MANUAL ...
Страница 2: ...MANIPULATOR MANUAL G3 series Rev 14 ...
Страница 8: ...vi G3 Rev 14 ...
Страница 14: ......
Страница 84: ...Setup Operation 5 Motion Range 72 G3 Rev 14 ...
Страница 85: ...Maintenance This volume contains maintenance procedures with safety precautions for G3 series Manipulators ...
Страница 86: ...74 ...
Страница 200: ...Maintenance 15 Maintenance Parts List 188 G3 Rev 14 ...