4-11
EMP-S4
SEIKO EPSON
Revision:B
4.2.6 Removing the Upper Case
1. Remove the 7 (C.B.P-TITE, 3x10, F/ZB-3C) screws that secure the Upper Case Unit.
Figure 4-6.
2. Carefully lift the front of the Upper Case taking care not to pull the two cables connected to
the Upper Case.
Figure 4-7.
Upper Case
CN502
Содержание EMP-S4
Страница 1: ...Service Manual Data Projector EMP S4 ...
Страница 13: ...Chapter 1 Product Specifications ...
Страница 25: ...1 13 EMP S4 SEIKO EPSON Revision B 1 5 External Views Figure 1 8 External Dimensions Unit mm ...
Страница 26: ...1 14 EMP S4 SEIKO EPSON Revision B Figure 1 9 External Dimensions Unit Inch ...
Страница 27: ...Chapter 2 Theory of Operation ...
Страница 49: ...Chapter 3 Troubleshooting ...
Страница 63: ...Chapter 4 Disassembly Assembly ...
Страница 97: ...Chapter 5 Appendix ...
Страница 102: ...5 6 EMP S4 SEIKO EPSON Revision B ...