CHF4000/4500
Installation Instructions
7
Projector Mount Installation to Ceiling Pipe
WARNING:
IMPROPER INSTALLATION CAN
RESULT IN SERIOUS PERSONAL INJURY OR
DAMAGE TO EQUIPMENT! Structural members
MUST
be capable of supporting five times the
combined weight of all equipment being mounted.
1.
Align projector mount (A) with end of ceiling pipe
(B).
2.
Thread projector mount (A) up onto threaded pipe
by turning until hand tight, with a minimum of four
threads engaged.
Rough Alignment of Projector Mount
1.
Turn projector mount (A) clockwise or counter-
clockwise until front of mount is facing target.
IMPORTANT ! :
When projector mount is
properly positioned, the set screw access hole
should be pointing directly at target. (See bottom
detail in figure at left.)
2.
Secure projector mount (A) to pipe by turning set
screw until tight.
CAUTION:
DO NOT OVERTIGHTEN! Over
tightening of setscrew can damage threads on pipe.
3.
Turn security screw using a Phillips screwdriver
until set screw cannot be seen through access hole
in projector mount.
1
1
2
(A)
2
1
3
1
(A)
Содержание CHF 4000
Страница 54: ...CHF4000 4500 Installation Instructions 54 ...
Страница 55: ...Installation Instructions CHF4000 4500 55 ...