/Action Laser 1300 Service Manual
Disassembly and Assembly
3.2.3.5
High Voltage Supply Board
Removal
1. Remove the housing. (Refer to Section
2. Remove the rear frame. (Refer to Section 3.2.1.2.)
3. Disconnect connectors
and
on
supply board
4. Remove 3
screws
x 8), and remove the high voltage supply board.
Figure 3-9. Removing the High Voltage Supply Board
Rev.
3-9
Содержание ActionLaser 1300
Страница 1: ...EPSON TERM NAL PR NTER EPL 3000 ActionLaser 1300 SERVICE MANUAL EPSON ...
Страница 8: ...REVISION SHEET t T Revision laeue Date Revision Page Rev A July 22 1994 let iesue C 5 i vii ...
Страница 101: ...EPL 3000 ActionLaser 1300 Service Manual Appendix Figure A 4 C144 MAIN Board Circuit Diagram 2 2 Rev A A n ...