Electrical Installation

The 

POWER

BOOST unit is designed for professional installation and should be connected by a 

suitably qualifi ed electrician in accordance with the latest IEE regulations.

Ensure that the electrical supply is fully isolated before removing any electrical covers. The 

POWER

BOOST unit must be earthed and it is recommended that an RCD is fi tted on the incoming 

electrical supply.

Single phase Powerboost units are suitable for voltage supply 230 +/- 10%. The supply cable should 

be sized 

POWER

BOOST to its required length allowing for voltage drop with all pumps running 

simultaneously and protected by a suitable MCB or fuse.  

Wiring Connections

The 

POWER

BOOST unit has provision for an external level switch input and a volt free general 

alarm output (BMS connection). Connections for these features are made within the main wiring 

box as per the diagrams below.

FLOW-V

Connect incoming power to RCD

Terminals 1 & 2 - 
Normally Closed alarm output

Terminals 3 & 4 - 
Level switch input, to be looped out if not required

Commissioning

1. 

Make a visual check to ensure all pipe work and electrical connections are connected in a 

safe manner.

2. 

Ensure the supply tank is suffi  ciently full and the pumps have been de-aerated.

3. 

Ensure that the closest outlet to the booster set is open to allow water to fl ow once the set 

is turned on.

4. 

Check the main discharge valve after the outlet manifold is closed and all other valves are 

fully open.

Содержание POWERBOOST FLOW V Series

Страница 1: ...POWERBOOST Clean Water Booster Sets Flow Range O M Manual...

Страница 2: ...ontents General 3 Installation Checklist 4 Location Consideration 5 Installation Information Diagrams 5 Commissioning 6 Pressure Vessel 7 Pump Speci cation 8 Controller Speci c Instructions Troublesho...

Страница 3: ...t commercial pressure boosting The POWERBOOST unit should not be installed in areas that are classified as hazardous or where there is a risk of an explosion or harm to people The manufacturer does no...

Страница 4: ...solation Valves should be fitted before and after the unit to allow for reliable service or repair 4 Fit the supplied pressure vessel to the discharge manifold See Page 7 5 In accordance with the late...

Страница 5: ...olation mounts are provided and should be fitted if required Outlet Manifold NB Pipe Work connections can be made to either end of the inlet outlet Manifold to suit your site layout Blanking Caps are...

Страница 6: ...rotected by a suitable MCB or fuse Wiring Connections The POWERBOOST unit has provision for an external level switch input and a volt free general alarm output BMS connection Connections for these fea...

Страница 7: ...oster unit if required Pressure Vessel Theairpre chargeinthepressurevesselshouldbeset65 ofthepre setworkingpressureformaximum e ectiveness It is recommended to check the tank air pressure every 4 6 mo...

Страница 8: ...00V Cut In System Pressure Flow Pressure 4CR80 0 55 0 75 3 4 2 2 3 80 5 2 5CR80 0 75 1 4 3 2 5 3 4 80 6 7 4CR100 0 75 1 4 5 2 6 2 3 100 5 0 5CR100 1 1 1 5 4 2 2 4 3 4 100 6 3 4CR200 1 5 2 7 3 4 2 3 4...

Страница 9: ...Steadypres Light Signals Steadypres Keyboard ON OFF BLINKING STATUS POWER STEADYPRES does not detect power supply WARNING cannot guarantee the absence of power supply the electronic board may be faul...

Страница 10: ...te and the inverter re starts in automatic mode HIGH TEMP BOX Only T T models The temperature inside the inverter has reached 65 C is automatically limited the maximum frequency of 5 Hz but the drive...

Страница 11: ...llowing documents ISO 12100 Safety of machinery General principles for design Risk assessment and risk reduction I hereby declare that the equipment above has been designed assembled and tested to com...

Страница 12: ...POWERBOOST byEPSGroup IRL NI powerboost ie info powerboost ie 094 963 3500 IRL 028 9181 8347 NI UK power boost co uk info power boost co uk 01543 415200...

Отзывы: