General
Delivery and Handling
The weight and size of the
POWER
BOOST unit may require the aid of lifting equipment and
must be handled in a safe manner. The unit must be lifted only by the base and not the pipe
work, pumps or vessel.
Inspection
On delivery, the
POWER
BOOST unit should be inspected thoroughly and any damage reported
to the supplier as soon as possible. This should be confirmed in writing within 48 hours.
Applications
The
POWER
BOOST FLOW range of cold water booster units are designed for domestic and light
commercial pressure boosting.
The
POWER
BOOST unit should not be installed in areas that are classified as hazardous or
where there is a risk of an explosion or harm to people. The manufacturer does not accept
responsibility if the unit is used to pump liquids other than clean water unless suitability has
previously been agreed in writing.
Warranty
All mechanical components of the
POWER
BOOST unit are covered by a 12 month warranty
against manufacturing defects. In case of failure please contact the relevant technical
department on one of the following:
Site Storage
Should a
POWER
BOOST unit need to be stored before installation it should be in a safe place
away from moisture, dust and frost.