General

Delivery and Handling

The weight and size of the 

POWER

BOOST unit may require the aid of lifting equipment and 

must be handled in a safe manner. The unit must be lifted only by the base and not the pipe 

work, pumps or vessel.

Inspection

On delivery, the 

POWER

BOOST unit should be inspected thoroughly and any damage reported 

to the supplier as soon as possible. This should be confirmed in writing within 48 hours.

Applications

The 

POWER

BOOST FLOW range of cold water booster units are designed for domestic and light 

commercial pressure boosting.

The 

POWER

BOOST unit should not be installed in areas that are classified as hazardous or 

where there is a risk of an explosion or harm to people. The manufacturer does not accept 

responsibility if the unit is used to pump liquids other than clean water unless suitability has 

previously been agreed in writing.

Warranty

All mechanical components of the 

POWER

BOOST unit are covered by a 12 month warranty 

against manufacturing defects.  In case of failure please contact the relevant technical 

department on one of the following:

Site Storage

Should a 

POWER

BOOST unit need to be stored before installation it should be in a safe place 

away from moisture, dust and frost.

ROI

094 963 3500

NI 

028 9181 8347

UK

01543 415200

Содержание POWERBOOST FLOW V Series

Страница 1: ...POWERBOOST Clean Water Booster Sets Flow Range O M Manual...

Страница 2: ...ontents General 3 Installation Checklist 4 Location Consideration 5 Installation Information Diagrams 5 Commissioning 6 Pressure Vessel 7 Pump Speci cation 8 Controller Speci c Instructions Troublesho...

Страница 3: ...t commercial pressure boosting The POWERBOOST unit should not be installed in areas that are classified as hazardous or where there is a risk of an explosion or harm to people The manufacturer does no...

Страница 4: ...solation Valves should be fitted before and after the unit to allow for reliable service or repair 4 Fit the supplied pressure vessel to the discharge manifold See Page 7 5 In accordance with the late...

Страница 5: ...olation mounts are provided and should be fitted if required Outlet Manifold NB Pipe Work connections can be made to either end of the inlet outlet Manifold to suit your site layout Blanking Caps are...

Страница 6: ...rotected by a suitable MCB or fuse Wiring Connections The POWERBOOST unit has provision for an external level switch input and a volt free general alarm output BMS connection Connections for these fea...

Страница 7: ...oster unit if required Pressure Vessel Theairpre chargeinthepressurevesselshouldbeset65 ofthepre setworkingpressureformaximum e ectiveness It is recommended to check the tank air pressure every 4 6 mo...

Страница 8: ...00V Cut In System Pressure Flow Pressure 4CR80 0 55 0 75 3 4 2 2 3 80 5 2 5CR80 0 75 1 4 3 2 5 3 4 80 6 7 4CR100 0 75 1 4 5 2 6 2 3 100 5 0 5CR100 1 1 1 5 4 2 2 4 3 4 100 6 3 4CR200 1 5 2 7 3 4 2 3 4...

Страница 9: ...Steadypres Light Signals Steadypres Keyboard ON OFF BLINKING STATUS POWER STEADYPRES does not detect power supply WARNING cannot guarantee the absence of power supply the electronic board may be faul...

Страница 10: ...te and the inverter re starts in automatic mode HIGH TEMP BOX Only T T models The temperature inside the inverter has reached 65 C is automatically limited the maximum frequency of 5 Hz but the drive...

Страница 11: ...llowing documents ISO 12100 Safety of machinery General principles for design Risk assessment and risk reduction I hereby declare that the equipment above has been designed assembled and tested to com...

Страница 12: ...POWERBOOST byEPSGroup IRL NI powerboost ie info powerboost ie 094 963 3500 IRL 028 9181 8347 NI UK power boost co uk info power boost co uk 01543 415200...

Отзывы: