![EP Equipment CQE12R Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/ep-equipment/cqe12r/cqe12r_operation-manual_2417106024.webp)
16
3.2 Operate and run the Reach Truck
3.2.1 Preparing
Before the reach truck can be commissioned, operated or a load unit lifted, the driver
must ensure that there is nobody within the hazardous area.
Checks and operations to be performed before starting daily work
– Make sure the Emergency stop switch is
depressed(6).
– Make sure the battery is connected
– Insert the key in the key switch ( 14) and
turn it to the right as far as it will go.
– Test the warning signal switch (13).
• Visually inspect the entire reach truck (in
particular wheels and load handler) for obvious damage.
3.2.2 Travel, Steering, Braking
Do not drive the reach truck unless the panels are closed and properly locked.
Warning!
Before operating the truck, check all
controls and warning devices for
proper operation. If any damage of
fault is found, don’t operate truck until
corrected.
叉车任何损坏或失灵,未修理回复前
禁止启动叉车。
Содержание CQE12R
Страница 1: ...I...
Страница 8: ...V I I...
Страница 19: ...11...
Страница 34: ...26 5 3 2 Lubrication Schedule...