
18
EN
130
180
3
1.
2.
A
Lines with mains voltage,
e.g. mains supply line, heat system, light
B
Connection line to sauna control unit
4. Open the relay box conduits for the lines.
5. Insert supplied rubber grommets into the openings of the lower part of the housing..
6. Route the connecting cables through the openings.
A
B
7. Hook the relay box into the upper screw using the upper mounting hole.
8. Securely tighten the relay box using the two lower mounting holes.
• Once you have completed all installation work you can connect the consumers and plug in
the lines.
• Connecting data lines (Elektroinstallation).
• Connecting and configuring consumers (Elektroinstallation).
9. Finally mount the front cover back on the control unit and secure it with 4 screws.
Dimensions in mm