After all modulating pump pressure points have been
adjusted and saved by pressing the “
Set
” button. Press the
“
Back
” button.
Fig. 25
Once acceptable combustion settings have been
achieved, It is
VERY IMPORTANT
to Press the
“Set”
button
to
SAVE
the setting each time a combustion point is set.
Fig. 24
Once acceptable combustion settings have been
achieved, It is
VERY IMPORTANT
to Press the
“Set”
button
to
SAVE
the setting.
Fig. 22
Step 6
- Once the air has been
bled
from the fuel pump
the burner should have established a flame on
“Pump
Pressure (bar
) Setting
7 Bar*
*Please note the start pressure setting may differ as it can
be altered in the parameter screens under “Initial Pump
Pressure (bar)”.
If the burner has not successfully established a flame on the
Initial Pump Pressure setting then alter the “Fan Speed %” by
pressing or - buttons and retry.
Fig. 20
Then press the
+
or
-
buttons to increase/decrease the
pump pressure setting (min 5bar to max 20bar depending
on boiler model). Then set/trim the fan speed so that flue
gas analyser reads the correct CO2% value given as 12.5-
13.5%.
Fig. 23
Repeat the process for each “Pump Pressure (bar)”
setting
Step 7
- Now the boiler is firing, locate the combustion
analyser test points and carry out a smoke and
combustion test with the aid of a smoke pump and
combustion flue gas analyser to ensure the combustion
levels are suitable.
Fig. 21
Combustion Analyser Test Points
Fig. 25
Fig. 24
Fig. 22
Fig. 21
Fig. 20
Fig. 23
Boiler Operation and Commissioning