6.2 Commissioning pre-checks
Prior to commissioning, please ensure the boiler has been installed in accordance of the requirements set out in
BS5410 Part 1 (Domestic) or Part 2 (Non-Domestic) and any local/ regional building regulations.
Before first firing of the boiler, please ensure that the commissioning is being undertaken by a competent or OFTEC
qualified engineer who has undertaken the relevant EOGB Modulating Burner Training.
Failure to ensure that the commissioning is not being carried out by an approved Sapphire Service Agent
will invalidate the warranty.
6.3 Check list
Ensure the boiler has been installed as per the
EOGB Sapphire Boiler Installation Manual
Ensure that all flow and return connections are free from leaks, valves are open, and that the boiler is filled with water.
Check and establish if the liquid fuel in the tank is suitable for this boiler specification
Check that there are filters fitted with the correct filtration requirements See
EOGB Sapphire Boiler Installation Manual
Ensure the oil supply is correctly connected.
Ensure that all oil valves are open between the tank and boiler and check for any leaks.
Important: ensure there are NO oil
isolation valves on the return side!
Ensure that flues are correctly sited, fitted and sealed.
Check all electrical connections and ensure the burner is Earthed
Check that the boilers condensate pipe is fitted correctly and securely and has been filled with water
Switch on the boiler and follow the “Initial Burner Start up & Commissioning Procedure” in Section 7.1.
Sapphire Modulating Blue Flame Burner