Operating Manual
Installation
30.03.2020 Version 1.0
©2020 enz® technik ag
Page
23
of
36
Installation
Assembly
The spray gun is delivered ready-to-operate. Use only high-pressure components
(hoses, couplings, etc.) that are permitted for the respective pressure and temperature
range. Use only replacement parts made by enz® technik ag.
SG-45 spray gun:
A swivel joint can be used for the connection between the high-pres-
sure hose and the spray gun to ensure that the high-pressure hose
does not become twisted.
To prevent blockages, install a fine dust filter in the water supply to
the high-pressure generator (50 μm).
Setting up the work area
Prior to working with enz® spray guns, the following actions must be taken:
Set up barriers and safety equipment (warning triangle, block off the area,
etc.).
Find out the necessary information about the object to be cleaned.
In containers and manholes:
Measuring instruments such as explosive gas meters, oxygen meters, gas
warning devices, etc. must be readily available and used.
The work area must be blocked off and secured so that there is no risk of
falling or danger caused by third parties.
Have the liability waiver signed to protect against any possible damage
claims.