Installation, Start-Up, Adjustment and Maintenance Manual
51
Note
: Make sure the two gaskets are positioned correctly and that generator housing is properly
sealed.
22. Reassemble the remaining parts in reverse order.
23. Turn on gas and electric supply to unit.
24. Start unit and check for correct operation.
Figure 31
– GENERATOR ASSEMBLY
FLUE GAS PASSAGE INSPECTION AND CLEANING
Early in the year before operating the chiller on cooling, complete the following instructions:
1.
Turn off gas and electric supply to the unit.
2.
Remove front panel.
3.
Remove top panel.
4.
Clean the base pan around the generator housing of any debris.
5.
Look down the flue opening at the back of the generator housing and clear any debris that may be
obstructing the opening (see Figure 31).
6.
Look down the air intake chute for combustion air and clear any debris that may be obstructing the
opening.
7.
Reinstall top panel.
8.
Reinstall front door.
9.
Turn on gas and electric supply to the unit.
10. Start unit to check for correct operation.
It is recommended that at least once a year a qualified service technician perform routine
maintenance on the equipment.
Gas burners do not normally require scheduled servicing; however, deterioration or an accumulation
of lint may cause yellowing flame or delayed ignition. Either condition indicates that a service call is
required.
BURNER / INSULATION
RETAINING STRAPS
BURNER TUBE
KIT NO. 16009-621
FRONT GENERATOR HOUSING
KIT NO. 16009-646
GENERATOR FINS
LOWER GENERATOR
BRACKET WITH
INSULATION
REAR GENERATOR
HOUSING
KIT NO. 16009-647
FLUE
GASKETS AND INSULATION
NOT SHOWN
BURNER TUBE GASKETS (NOT SHOWN)
KIT NO. 16009-716