background image

Introduction

ELECTRICAL:  The  use  of  a  surge  protected  power  bar  is  recommended.  The  unit  must  be 

grounded. The grounded electrical cord should be connected to a standard 115 volts (4.6 Amps), 60 

hertz electrical outlet.  Be careful that the electrical cord is not trapped under the appliance and that it is 

clear of any hot surfaces or sharp edges and also must be accessible. If this power cord should become 

damaged, a replacement power cord must be purchased from the manufacture or a qualified ENVIRO 

dealer. This unit’s maximum power requirement is 520 watts.

GLASS: Do not abuse the glass by striking or slamming the door.  Do not attempt to operate the stove 

with broken glass. The stove uses ceramic glass. Replacement glass must be purchased from an ENVIRO 

dealer.  Do not attempt to open the door and clean the glass while the unit is in operation or if glass is 

hot. To clean the glass, use a soft cotton cloth and mild window cleaner, gas or wood stove glass cleaner, 

or take a damp paper towel and dip into the fly ash. This is a very mild abrasive and will not damage the 

glass.

FLAMMABLE  LIQUIDS:  Never  use  gasoline,  gasoline-type  lantern  fuel,  kerosene,  charcoal  lighter 

fluid, or similar liquids to start or “freshen up” a fire in the heater.  Keep all such liquids well away from 

the heater while it is in use.

SMOKE DETECTOR: Smoke detectors should be installed and maintained in the structure when installing 

and operating a pellet burning appliance.

OPERATION: The ash pan and door must be closed securely for proper and safe operation of the pellet 

stove. Also ensure all gaskets on the door are checked and replaced when necessary.  

INSTALLATION: Be sure to maintain the structural integrity of your home when passing a vent through 

walls, ceilings, or roofs. It is recommended that the unit be secured into its position in order to avoid any 

displacement.
DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT.
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.

FRESH AIR: Outside Fresh Air connection is optional. Must be connected to all units installed in Mobile 

and “Air Tight Homes” (R2000) or where required by local codes. Consider all large air moving devices 

when installing your unit and provide room air accordingly. Limited air for combustion may result in poor 

performance, smoking and other side effects of poor combustion.

If you have any questions with regards to your stove or the above-mentioned information, please feel 

free to contact your local dealer for further clarification and comments.
SINCE  SHERWOOD  INDUSTRIES  LTD.  HAS  NO  CONTROL  OVER  THE  INSTALLATION  OF 

YOUR STOVE, SHERWOOD INDUSTRIES LTD. GRANTS NO WARRANTY IMPLIED OR STATED 

FOR  THE  INSTALLATION  OR  MAINTENANCE  OF  YOUR  STOVE.  THEREFORE,  SHERWOOD 

INDUSTRIES LTD. ASSUMES NO RESPONSIBILITY FOR ANY CONSEQUENTIAL DAMAGE(S).

4

Содержание Meridian Cast Iron

Страница 1: ...NSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH CONTACT YOUR BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA INSTALLER LEAVE...

Страница 2: ...ion Installation Recommended 15 Through Concrete Wall with Vertical Rise Installations 15 Inside Vertical Installations 16 Outside Vertical Installations 17 Hearth Mount Installation 18 Installation w...

Страница 3: ...ombustion air is achieved by adjusting the slider damper located on the left side of the stove When installing the stove in a mobile home it must be electrically grounded to the steel chassis of the h...

Страница 4: ...DETECTOR Smoke detectors should be installed and maintained in the structure when installing and operating a pellet burning appliance OPERATION The ash pan and door must be closed securely for proper...

Страница 5: ...imum Heat Content approximately 8200 Btu per pound minimum ASH The ash content of the fuel and operation of your stove will directly determine the frequency of cleaning The use of high ash fuels may r...

Страница 6: ...herwise operate this pellet heater in a manner inconsistent with operating instructions in this manual Installation Deciding Where to Locate your Pellet Appliance 1 Check clearances to combustibles se...

Страница 7: ...a 3 8 socket or wrench see Figure 1 1 Next remove the two 2 screws securing the rear shipping brace using a T20 screwdriver see Figure 1 2 The steel shipping brackets are not part of the stove and can...

Страница 8: ...minimum clearances but it is recommended that you ensure sufficient room for serving routine cleaning and maintenance Figure 4 Minimum Clearances to Combustibles for Meridian Cast Iron This pellet st...

Страница 9: ...Minimum Width 36 914mm Minimum Height 48 1219mm Maximum Depth 30 762mm Figure 5 Alcove Clearances Freestanding Meridian Installation Alcove Clearances 9...

Страница 10: ...using the holes in the legs of the appliance Ensure the unit is electrically grounded to the chassis of your home permanently WARNING Do not install in a room people sleep in CAUTION The structural i...

Страница 11: ...1 for allowable exterior vent termination locations Table 1 Use in conjunction with Figure 13 for allowable exterior vent termination locations Letter Minimum Clearance Description A 24 in 61 cm Above...

Страница 12: ...Connection Figure 8 Meridian Cast Iron Inlet and Outlet Location 12 INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENTING MANUFACTURER Outside fresh air is mandatory when installing this unit in airtig...

Страница 13: ...g wiring etc 2 Install a non combustible hearth pad where necessary 3 Place the appliance 15 37 5 cm away from the wall If the stove is to be set on a hearth pad set the unit on it 4 Locate the center...

Страница 14: ...aight through wall Installation 10 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the outside of the home to connect to the first se...

Страница 15: ...a rodent screen may be used in place of the termination cap or stainless steel termination hood Through Concrete Wall With Vertical Rise Installations A 45 elbow with a rodent screen may be used in pl...

Страница 16: ...carpeted surface and space the unit in a manner so when the pellet vent is installed vertically it will be 3 76 mm away from a combustible wall 3 Locate the center of the fresh air intake pipe on the...

Страница 17: ...out on the outside of the house 2 Install PL vent upward from the tee Make sure that you install support brackets to keep the vent straight and secure 3 Install ceiling thimble and secure the flashin...

Страница 18: ...he fireplace dampers 3 Connect a clean out tee or a 90 elbow to the exhaust pipe 4 Install flexible stainless steel liner or listed pellet vent to the top of the chimney Floor Protection Combustible F...

Страница 19: ...the gasketed opening in the stove where the exhaust motor was removed from 4 Install the exhaust blower motor in the Exterior Vent Housing Box onto the exhaust blower housing 5 Follow the procedures f...

Страница 20: ...mall bead of high temperature silicone at each chimney connection Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in accordanc...

Страница 21: ...side Vertical Installations Ensure that vent pipe is properly secured to wall using wall straps Maintain clearances to combustibles on vent pipe as well as unit Rain Cap Roof sheathing Storm collar Ro...

Страница 22: ...controls to one of three mode settings manual high low or auto off 4 FEED RATE TRIM BUTTON Used to change the feed rate trims in second increments for all ROOM AIR FAN ON OFF ON OFF FEED RATE TRIM CO...

Страница 23: ...n the thermostat contacts open the HEAT LEVEL and Fans will drop down to the LOW setting until the thermostat contacts close again The LOW heat setting can be adjusted for different fuel qualities see...

Страница 24: ...OFF turn the thermostat down or off NOTE The unit will run on low for three 3 minutes before it turns off DO NOT unplug unit while Combustion fan is operating This may lead to smoke escaping from the...

Страница 25: ...e Tuning For Fuel Quality Due to fuel quality the slider damper and control board trims may need to be fine tuned A tall lazy flame with dark orange tips requires more air Open slider pull out slightl...

Страница 26: ...ger to jam and may result in pellets burning in the drop tube and hopper Using a metal scrapper remove material that has accumulated or is clogging the liner s holes Then dispose of the scrapped ashes...

Страница 27: ...t assembly ASH PAN weekly The ash pan is located under the burner Dump the ashes into a metal container stored away from combustibles Monitor the ash level every week Remember that different pellet fu...

Страница 28: ...firebox door by lifting the handle remove the burn pot and burn pot liner Lubricate all screws with penetrating oil Remove the four 4 screws that hold the steel liner retainers in place Remove side st...

Страница 29: ...in the burn pot Check the Heat Level Indicator If the 2 light is flashing see the 2 light is flashing Check the fuse on the circuit board If the unit still does not start contact your local service d...

Страница 30: ...is installed Check the operation by opening a window does this solve the problem If it does install fresh air intake to unit or room Venting system may require vertical section to move termination int...

Страница 31: ...gnitor should be bright orange in color If not replace the ignitor 9 Control settings Heat Level has no effect on the fire NOTE If the system light is flashing the Control Board has complete control o...

Страница 32: ...ey Grey Grey Grey Purple Purple Blue 115V Black 220V Brown Black Black Black Blue Black Armor Cable Supplied Vacuum Switch Combustion Blower Optional Exterior Exhaust Blower Power Cord Ground Ignitor...

Страница 33: ...ne Hose EF 018 Aluminum Hose Barb EF 019 7 Auger EF 025 8 Circuit Board 50 1929 Circuit Board Decal 50 1930 9 Brass Auger Bushing EF 065 10 Combustion Exhaust Blower 115V 50 473 11 Slider Damper Plate...

Страница 34: ...0 Back Grill 50 675 21 Hopper Lid 50 3108 22 Flush Handle for Hopper Lid 50 3109 23 Firebox Door Complete 50 3110 24 Firebox Door Glass Set w Tape EF 062 25 Firebox Door Latch handle 50 2827 26 Wood D...

Страница 35: ...MERIDIAN CAST IRON Components May 2015 4 11 1 10 6 2 9 7 5 3 8 Parts Diagram Components 35...

Страница 36: ...24 27 23 26 25 14 12 16 15 29 28 20 30 32 19 31 33 13 17 18 18 21 22 33 MERIDIAN CAST IRON Components Cast Steel May 2015 Parts Diagram Cast Steel 36...

Страница 37: ...it to edge of floor protection De la porte ouvrant au devant de protection de plancher 6 152 mm NOTE A combustible floor must be protected by a non combustible material Width 27 686mm by depth 34 864m...

Страница 38: ...Notes 38...

Страница 39: ...39...

Страница 40: ...L NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE _____________...

Отзывы: