Enviro Meridian Cast Iron Скачать руководство пользователя страница 14

Exhaust Tube

3" (75mm) or 4" (100mm)

"PL" or "L" vent

Wall Thimble

45° Elbow with screen 

or Termination Cap

Fresh Air Intake

High Temperature RTV

Silicone Required

Wall framing

Wall thimble

Termination

cap

Vent pipe

Horizontal frame 

for thimble

ENVIRO Meridian Cast Iron

• This is due to the back pressure in the exhaust 

caused by airflow around the structure.

•  All  sections  of  pipe  must  have  three  (3) 

screws  evenly  spaced  and  all  horizontal 

and vertical vent sections located within the 

house must have a bead of high temperature 

silicone installed on the male end of the pipe 

before installation to create a gas tight seal.

• The termination must be 12 inches (30 cm) 

from the outside wall and 12 inches (30 cm) 

above the ground.

• A 45° elbow with a rodent screen may be 

used  in  place  of  the  termination  cap  (or 

stainless steel termination hood). 

Installation

Figure 11: Straight through wall Installation. 

10. The 

pipe 

must 

extend  at  least 

12”  (30  cm)  away 

from  the  building. 

If  necessary,  bring 

another  length  of 

pipe (PL type) to the 

outside of the home 

to  connect  to  the 

first section. Do not 

forget to place high 

temperature silicone 

around the pipe that 

passes  through  the 

thimble.

11. Install a vertical pipe, 

or if all requirements 

for  direct  venting 

are met, install vent 

termination. 

The 

stainless  steel  cap 

termination  manufactured  by  the  vent  manufacturer  is  recommended.  However,  when  the  vent 

terminates several feet above ground level and there are no trees, plants, etc. within several feet, 

a  45°  elbow  can  be  used  as  termination.  The  elbow  must  be  turned  down  to  prevent  rain  from 

entering. 

NOTE:

• Some horizontal through wall installations may require a “T” and 3 to 5 feet (91 to 152 cm) of vertical 

pipe outside the building to help naturally draft in the unit. 

• This may be required if a proper burn cannot be maintained, after the stove has been tested and the 

airflow set. 

Figure 12: Straight through Wall Installation - Side View. 

14

Содержание Meridian Cast Iron

Страница 1: ...NSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH CONTACT YOUR BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA INSTALLER LEAVE...

Страница 2: ...ion Installation Recommended 15 Through Concrete Wall with Vertical Rise Installations 15 Inside Vertical Installations 16 Outside Vertical Installations 17 Hearth Mount Installation 18 Installation w...

Страница 3: ...ombustion air is achieved by adjusting the slider damper located on the left side of the stove When installing the stove in a mobile home it must be electrically grounded to the steel chassis of the h...

Страница 4: ...DETECTOR Smoke detectors should be installed and maintained in the structure when installing and operating a pellet burning appliance OPERATION The ash pan and door must be closed securely for proper...

Страница 5: ...imum Heat Content approximately 8200 Btu per pound minimum ASH The ash content of the fuel and operation of your stove will directly determine the frequency of cleaning The use of high ash fuels may r...

Страница 6: ...herwise operate this pellet heater in a manner inconsistent with operating instructions in this manual Installation Deciding Where to Locate your Pellet Appliance 1 Check clearances to combustibles se...

Страница 7: ...a 3 8 socket or wrench see Figure 1 1 Next remove the two 2 screws securing the rear shipping brace using a T20 screwdriver see Figure 1 2 The steel shipping brackets are not part of the stove and can...

Страница 8: ...minimum clearances but it is recommended that you ensure sufficient room for serving routine cleaning and maintenance Figure 4 Minimum Clearances to Combustibles for Meridian Cast Iron This pellet st...

Страница 9: ...Minimum Width 36 914mm Minimum Height 48 1219mm Maximum Depth 30 762mm Figure 5 Alcove Clearances Freestanding Meridian Installation Alcove Clearances 9...

Страница 10: ...using the holes in the legs of the appliance Ensure the unit is electrically grounded to the chassis of your home permanently WARNING Do not install in a room people sleep in CAUTION The structural i...

Страница 11: ...1 for allowable exterior vent termination locations Table 1 Use in conjunction with Figure 13 for allowable exterior vent termination locations Letter Minimum Clearance Description A 24 in 61 cm Above...

Страница 12: ...Connection Figure 8 Meridian Cast Iron Inlet and Outlet Location 12 INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENTING MANUFACTURER Outside fresh air is mandatory when installing this unit in airtig...

Страница 13: ...g wiring etc 2 Install a non combustible hearth pad where necessary 3 Place the appliance 15 37 5 cm away from the wall If the stove is to be set on a hearth pad set the unit on it 4 Locate the center...

Страница 14: ...aight through wall Installation 10 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the outside of the home to connect to the first se...

Страница 15: ...a rodent screen may be used in place of the termination cap or stainless steel termination hood Through Concrete Wall With Vertical Rise Installations A 45 elbow with a rodent screen may be used in pl...

Страница 16: ...carpeted surface and space the unit in a manner so when the pellet vent is installed vertically it will be 3 76 mm away from a combustible wall 3 Locate the center of the fresh air intake pipe on the...

Страница 17: ...out on the outside of the house 2 Install PL vent upward from the tee Make sure that you install support brackets to keep the vent straight and secure 3 Install ceiling thimble and secure the flashin...

Страница 18: ...he fireplace dampers 3 Connect a clean out tee or a 90 elbow to the exhaust pipe 4 Install flexible stainless steel liner or listed pellet vent to the top of the chimney Floor Protection Combustible F...

Страница 19: ...the gasketed opening in the stove where the exhaust motor was removed from 4 Install the exhaust blower motor in the Exterior Vent Housing Box onto the exhaust blower housing 5 Follow the procedures f...

Страница 20: ...mall bead of high temperature silicone at each chimney connection Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in accordanc...

Страница 21: ...side Vertical Installations Ensure that vent pipe is properly secured to wall using wall straps Maintain clearances to combustibles on vent pipe as well as unit Rain Cap Roof sheathing Storm collar Ro...

Страница 22: ...controls to one of three mode settings manual high low or auto off 4 FEED RATE TRIM BUTTON Used to change the feed rate trims in second increments for all ROOM AIR FAN ON OFF ON OFF FEED RATE TRIM CO...

Страница 23: ...n the thermostat contacts open the HEAT LEVEL and Fans will drop down to the LOW setting until the thermostat contacts close again The LOW heat setting can be adjusted for different fuel qualities see...

Страница 24: ...OFF turn the thermostat down or off NOTE The unit will run on low for three 3 minutes before it turns off DO NOT unplug unit while Combustion fan is operating This may lead to smoke escaping from the...

Страница 25: ...e Tuning For Fuel Quality Due to fuel quality the slider damper and control board trims may need to be fine tuned A tall lazy flame with dark orange tips requires more air Open slider pull out slightl...

Страница 26: ...ger to jam and may result in pellets burning in the drop tube and hopper Using a metal scrapper remove material that has accumulated or is clogging the liner s holes Then dispose of the scrapped ashes...

Страница 27: ...t assembly ASH PAN weekly The ash pan is located under the burner Dump the ashes into a metal container stored away from combustibles Monitor the ash level every week Remember that different pellet fu...

Страница 28: ...firebox door by lifting the handle remove the burn pot and burn pot liner Lubricate all screws with penetrating oil Remove the four 4 screws that hold the steel liner retainers in place Remove side st...

Страница 29: ...in the burn pot Check the Heat Level Indicator If the 2 light is flashing see the 2 light is flashing Check the fuse on the circuit board If the unit still does not start contact your local service d...

Страница 30: ...is installed Check the operation by opening a window does this solve the problem If it does install fresh air intake to unit or room Venting system may require vertical section to move termination int...

Страница 31: ...gnitor should be bright orange in color If not replace the ignitor 9 Control settings Heat Level has no effect on the fire NOTE If the system light is flashing the Control Board has complete control o...

Страница 32: ...ey Grey Grey Grey Purple Purple Blue 115V Black 220V Brown Black Black Black Blue Black Armor Cable Supplied Vacuum Switch Combustion Blower Optional Exterior Exhaust Blower Power Cord Ground Ignitor...

Страница 33: ...ne Hose EF 018 Aluminum Hose Barb EF 019 7 Auger EF 025 8 Circuit Board 50 1929 Circuit Board Decal 50 1930 9 Brass Auger Bushing EF 065 10 Combustion Exhaust Blower 115V 50 473 11 Slider Damper Plate...

Страница 34: ...0 Back Grill 50 675 21 Hopper Lid 50 3108 22 Flush Handle for Hopper Lid 50 3109 23 Firebox Door Complete 50 3110 24 Firebox Door Glass Set w Tape EF 062 25 Firebox Door Latch handle 50 2827 26 Wood D...

Страница 35: ...MERIDIAN CAST IRON Components May 2015 4 11 1 10 6 2 9 7 5 3 8 Parts Diagram Components 35...

Страница 36: ...24 27 23 26 25 14 12 16 15 29 28 20 30 32 19 31 33 13 17 18 18 21 22 33 MERIDIAN CAST IRON Components Cast Steel May 2015 Parts Diagram Cast Steel 36...

Страница 37: ...it to edge of floor protection De la porte ouvrant au devant de protection de plancher 6 152 mm NOTE A combustible floor must be protected by a non combustible material Width 27 686mm by depth 34 864m...

Страница 38: ...Notes 38...

Страница 39: ...39...

Страница 40: ...L NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE _____________...

Отзывы: