54
Secondary Installation
Step 7
Rest Log 7 at an angle on top of the log
grate and Log 6.
Step 8
Place Log 8 between the grate arms, with
the bottom of the log resting on the edge
of the ember bed.
Step 9
Place Log 9 between the grate arms, with
the bottom of the log resting on the edge of
the ember bed.
Содержание G39LI
Страница 57: ...57 Parts Diagram 1 2 3 4 5 8 16 9 7 6 10 15 14 11 12 13 ...
Страница 58: ...58 Notes ...