22
Installation
M
ODEL
1700-V B
RICK
P
LACEMENT
& T
UBE
L
OCATIONS
:
COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.
When replacing bricks, use only pumas type fire bricks.
TOTAL BRICKS:
16 - Full size bricks 9” long x 4.5” wide x 1.25” thick
(22.9 cm long x 11.4 cm wide x 3.2 cm thick)
2 - Partial bricks 9” long x 3” wide x 1.25” thick
(22.9 cm long x 7.6 cm wide 3.2 cm thick)
Removing Air Tube:
If a secondary air tube needs to be removed, place a screwdriver (any style except
flat head) into one of the air holes and tap it with a hammer/mallet to the left until the right end of the
tube is freed. To installation a secondary air tube reverse the above instructions.
IMPORTANT:
All secondary air tubes must be in place for proper operation.
Full S
ize Br
ick
Partia
l Brick
Tube A
Tube C
Tube B
Full S
ize Br
ick
Full S
ize Br
ick
Figure 22: Brick Placement for 1700-V shown with Secondary Air Channel
and Tubes.
1.
Place the four (4) full size
bricks along each side of
the firebox and one (1) full
size brick on either side of
the back of the firebox.
2.
To place the floor bricks, lay
the two (2) partial bricks
along the back of the floor.
Then on the left, lay three
(3) full size bricks and on
the right, lay two (2) full
size bricks in the center and
the half brick in the front
(for the ash dump). The
spaces between the bricks
will soon fill with ashes.