EDSL450 User manual
14
4
Maintenance
According to the EN16005, DIN18650, and AutSchR for escape routes, the installer retains
responsibility for the safe operation of the sliding door, only when user instructions are obeyed and
the service checklist and scheduled maintenance tasks are done by authorised/certified people. If
not, the owner takes over all responsibility. The owner is responsible that maintenance is carried out!
4.1
Preventive maintenance schedule
Frequency
Part
Tasks
Daily
Door complete
Do the daily start procedure
Do the daily function check after start
procedure
Do the daily stop procedure
Make sure the door leaves are clean
but visible
Make sure the door leaves are free of
obstacles (boxes, goods etc.)
Floor guides
Make sure the leaves are guided
properly and remove any debris from
floor/track.
follow the local
regulations but not
less as every 12
months
Door complete
Annual inspection made by authorised
Service Partner.
4.2
Replacement schedule
Apart from regulatory maintenance, we at Entrance Dynamics think it is important for our doors to
be treated the same way as a vehicle; change the oil and the tires at the correct time. With
preventive replacement you make sure the product keeps its functionality, safety and classification.
It keeps the warranty valid and prevents unexpected and expensive breakdowns or accidents. The
following list contains the recommended replacement frequencies.
Frequency
Tasks
Every year or 100.000 openings
Replace the floor guide
Every 3 years or 250.000 openings Replace the backup batteries
Replace the replaceable part of the key switch
Replace the mohair brush
Replace the tooth belt