Connecting AC and PoE Power
3-16 Hardware Installation
Figure 3-8 Connecting AC Power and RPS
3.
Observe
the
power
CPU
LED
(not
shown)
located
on
the
front
panel.
During
the
initialization,
the
CPU
LED
will
start
by
illuminating
solid
amber,
then
start
blinking
green,
then
blinking
amber,
then
blinking
green
again
until
the
end
of
the
initialization,
and
then
turns
solid
green.
If
the
switch
is
a
standalone
unit,
it
will
take
approximately
30 seconds
for
the
switch
to
start
up.
If
the
switch
is
a
stack
Manager,
it
can
take
up
to
3
minutes
or
more
to
start
up,
depending
on
the
number
of
Member
switches
in
the
stack.
1
AC power cord
2
AC power connector
3
Connector for external redundant power supply
Note:
If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
Chapter 4
. If you need
additional help, contact Enterasys Networks. Refer to “
Getting Help
” on page xvi for
details
.
Redu
ndan
t Pow
er Su
pply
AC L
INE
100-2
40 VA
C
50-60
Hz
0.8 A
MAX
MA
C ADDRES
S
SERI
AL
NO.
STAC
K UP
STAC
K DO
WN
À
Á
Â
Содержание SecureStack B3G124-24P
Страница 2: ......
Страница 14: ...xii...
Страница 68: ...Using the Reset Switch 4 10 Troubleshooting...
Страница 76: ...Regulatory Compliance A 8 Specifications...