SHB120 LAG1155 Full-Size SBC U
ser’s Manual
Hardware Installation
30
Perform Visual and Tactile verification that protective cover is properly seated in the
LGA1155 Socket:
*Hold cover and move gently "side to side" to feel the play within the cover and the
LGA1155 Socket.
Close the socket load plate and engage the load lever (see image below).
Содержание SHB120
Страница 7: ...vi MEMO ...
Страница 13: ...SHB120 LAG1155 Full Size SBC User s Manual Jumpers And Connectors 6 2 2 Board Layout ...
Страница 39: ...SHB120 LAG1155 Full Size SBC User s Manual Hardware Installation 32 MEMO ...
Страница 57: ...SHB120 LAG1155 Full Size SBC User s Manual AMI BIOS Utility 50 Intel RC Drivers Version Detail ...
Страница 65: ...SHB120 LAG1155 Full Size SBC User s Manual AMI BIOS Utility 58 MEMO ...
Страница 69: ...SHB120 LAG1155 Full Size SBC User s Manual PCI IRQ Routing 62 MEMO ...
Страница 89: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 82 1 Select Network Setup to configure AMT 3 1 ...
Страница 91: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 84 ...
Страница 93: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 86 Subnet mask ...
Страница 97: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 90 MEMO ...
Страница 103: ...SHB120 LAG1155 Full Size SBC User s Manual PICMG v1 3 Interface Definition 96 MEMO ...