SHB120 LAG1155 Full-Size SBC U
ser’s Manual
Hardware Installation
24
Step2 Removing the socket protective cover:
Place thumb against the front edge of the protective cover and rest index finger on the
rear grip to maintain control of the cover.
Lift the front edge of the protective cover to disengage from the socket. Keep control of
the cover by holding the rear grip with index finger.
Lift protective cover away from the socket, being careful not to touch the electrical
contacts.
NOTE: Vertical removal is NOT recommended, as it requires higher force and can lead to socket
contact damage.
Caution: Never Touch Fragile Socket Contacts to Avoid Damage and Do Not Touch Processor
Sensitive Contacts at Any Time During Installation
.
Содержание SHB120
Страница 7: ...vi MEMO ...
Страница 13: ...SHB120 LAG1155 Full Size SBC User s Manual Jumpers And Connectors 6 2 2 Board Layout ...
Страница 39: ...SHB120 LAG1155 Full Size SBC User s Manual Hardware Installation 32 MEMO ...
Страница 57: ...SHB120 LAG1155 Full Size SBC User s Manual AMI BIOS Utility 50 Intel RC Drivers Version Detail ...
Страница 65: ...SHB120 LAG1155 Full Size SBC User s Manual AMI BIOS Utility 58 MEMO ...
Страница 69: ...SHB120 LAG1155 Full Size SBC User s Manual PCI IRQ Routing 62 MEMO ...
Страница 89: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 82 1 Select Network Setup to configure AMT 3 1 ...
Страница 91: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 84 ...
Страница 93: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 86 Subnet mask ...
Страница 97: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 90 MEMO ...
Страница 103: ...SHB120 LAG1155 Full Size SBC User s Manual PICMG v1 3 Interface Definition 96 MEMO ...