
50
Solution 1.8 Installation and Operation Manual
Appendix 7: Installation of Secondary Air Tubes and Baffle
1- Remove the hatched bricks as per drawing.
2- Starting with the rear tube, lean and insert
the right end of the secondary air tube into
the rear right channel hole. Then lift and
insert the left end of the tube into the rear
left channel.
3- Align the notch in the left end of the tube
with the key of the left air channel hole.
Make sure the notch reaches the end of the
key way.
Содержание Solution 1.8
Страница 8: ...8 Solution 1 8 Installation and Operation Manual ...
Страница 28: ...28 Solution 1 8 Installation and Operation Manual Clearances to combustible materials and floor protection ...
Страница 31: ...Solution 1 8 Installation and Operation Manual 31 Clearances for shield construction ...
Страница 53: ...Solution 1 8 Installation and Operation Manual 53 Appendix 8 Exploded Diagram and Parts List ...