
Solution 1.8 Installation and Operation Manual
47
Appendix 5: Installing the Optional Fresh Air Kit
(OA10500/AC02090)
When installed with a fresh air kit, the stove must be anchored to the floor
This mobile home approved stove requires installation of a fresh air kit (A) and an insulated fresh
air intake pipe (B), sold separately.
Installation on the back
Installation on the bottom
Содержание Solution 1.8
Страница 8: ...8 Solution 1 8 Installation and Operation Manual ...
Страница 28: ...28 Solution 1 8 Installation and Operation Manual Clearances to combustible materials and floor protection ...
Страница 31: ...Solution 1 8 Installation and Operation Manual 31 Clearances for shield construction ...
Страница 53: ...Solution 1 8 Installation and Operation Manual 53 Appendix 8 Exploded Diagram and Parts List ...