Solution 1.8 Installation and Operation Manual
43
Pedestal kit installation:
Follow
step 1, 2
and
3
of the leg kit
installation.
5- Secure pedestal base to the underside
of the firebox using the bolts, washers
and nuts removed in
step 3
.
Note
: Insert each bolt from the inside of the
firebox, this will allow the bricks to sit more
evenly on the floor of the firebox.
6- Gently flip the stove back on its
pedestal making sure not to put too
much weight on the rear edge of the
base.
7- Secure the air control cover to the
brackets under the ash lip with 2 screws
then install the coil handle on the control
rod by turning it counterclockwise.
8- Secure the pedestal backing panel to
the rear of the pedestal.
9- Open the ash drawer lid then slide it into
the front opening of the pedestal.
10- Position the stove for its installation and
reinstall the door and the bricks (see
Appendix 8: Exploded Diagram and
Parts List
for layout).
Note
: Make sure that baffle components
have not moved during the leg installation
process since a flue blockage may occur.
Содержание Solution 1.8
Страница 8: ...8 Solution 1 8 Installation and Operation Manual ...
Страница 28: ...28 Solution 1 8 Installation and Operation Manual Clearances to combustible materials and floor protection ...
Страница 31: ...Solution 1 8 Installation and Operation Manual 31 Clearances for shield construction ...
Страница 53: ...Solution 1 8 Installation and Operation Manual 53 Appendix 8 Exploded Diagram and Parts List ...