Euromax Pellet Stove Installation and Operation Manual
15
•
2 horizontal run of 1’ = (2 X 1’) X 1’ = 2’ of EVL
•
1 elbow 90° or "Tee" = 5’ of EVL
•
3 vertical length of 4’ = (3 X 4’) X 0.5’ = 6’ of EVL
•
Total EVL = (2’ + 5’ + 6’) = 13’.
NOTE
For example, let’s imagine an installation consisting of a
horizontal vent coming out at the back of the stove on a total
distance of 8 feet. This horizontal run is followed by a tee and a
6-foot vertical rise. This type of installation is not acceptable. As
you can see, the vent termination is clearly outside the allowed
configuration zone on the chart because the venting system
proposed
: Do not include the exterior wall termination in the EVL calculation (45° elbow
and termination).
does not have at least one foot of vertical rise for
each foot of horizontal run
.
Instead, if the installation consisted of a horizontal vent coming
out at the back of the stove on a total distance of 4 feet,
followed by a tee and a 6-foot vertical rise, it would be
acceptable. The installation end should be within the allowable
configuration zone on the chart since it would have at least one
foot of vertical rise for each foot of horizontal run. Furthermore,
the total vertical rise would be at least 3-foot high.
WARNING:
4.4 Termination Location
To reduce the risk of smoke spillage there
should always be at least one foot of vertical rise for each
foot of horizontal run. In all cases, at least 3 feet of vertical
rise is needed.
Termination should not be located so that
hot exhaust gases can be a hazard. They
can reach temperatures of 500°F (260°C)
and cause serious burns.
CAUTION: TERMINATION COLLAR
(SPARK ARRESTER) IS MANDATORY.
O.K.
Содержание Euromax
Страница 63: ...Euromax Pellet Stove Installation and Operation Manual 63 10 Wiring Diagram ...
Страница 75: ...Euromax Pellet Stove Installation and Operation Manual 75 15 Exploded View and Replacement Parts SECTION A ...
Страница 76: ...76 Euromax Pellet Stove Installation and Operation Manual SECTION B ...
Страница 77: ...Euromax Pellet Stove Installation and Operation Manual 77 SECTION C ...
Страница 78: ...78 Euromax Pellet Stove Installation and Operation Manual SECTION D SECTION E ...
Страница 79: ...Euromax Pellet Stove Installation and Operation Manual 79 SECTION F SECTION G ...
Страница 80: ...80 Euromax Pellet Stove Installation and Operation Manual SECTION H SECTION I ...
Страница 81: ...Euromax Pellet Stove Installation and Operation Manual 81 SECTION J ...