33
Installation instructions
EN
Replacing filters
Replacing filters (generic view)
NOTE:
Vacuum the inside of the unit for better
performance and cleaner indoor air.
Bag filter
To replace:
DANGER
DANGER:
Before opening the service hatch,
always make sure that the unit’s supply voltage
is switched off.
NOTE:
For LTR-series units: The power cuts off
when the service hatch is opened.
1. Open the service hatch.
2. Release the filter locking levers, if there are any.
3. Pull the old filter out of the unit.
4. Insert a new filter.
5. Close the filter locking levers, if there are any.
6. Close the service hatch properly.
7. Switch the power on.
TIP:
Remove the metal frame from the used bag
filter and recycle it along with metal waste. The
filter fabric can be disposed of along with mixed
waste.
Plain filter
To replace:
DANGER
DANGER:
Before opening the service hatch,
always make sure that the unit’s supply voltage
is switched off.
NOTE:
For LTR-series units: The power cuts off
when the service hatch is opened.
1. Open the service hatch.
2. Remove the filter from the ventilation device.
3. Remove the filter fabric from the frame.
4. Replace the filter fabric with a new one.
5. Insert the filter back into the unit so that the
support grid faces the heat recovery wheel.
6. Close the service hatch properly.
7. Switch the power on.
TIP:
Replace only the fabric part of the plain
filter. Reuse the metal frame with a clean filter.
The filter fabric can be disposed of along with
mixed waste.
Pleated filter
To replace:
DANGER
DANGER:
Before opening the service hatch,
always make sure that the unit’s supply voltage
is switched off.
NOTE:
For LTR-series units: The power cuts off
when the service hatch is opened.
1. Open the service hatch.
2. Remove the filter from the ventilation device.
3. Insert the new filter.
•
Pay attention to the arrow on the filter
showing the airflow through the filter.
4. Close the service hatch properly.
5. Switch the power on.
TIP:
The filter can be disposed of along with
mixed waste.
Содержание eWind LTR-2
Страница 1: ...12 7 2017 Enervent eWind Installation instruction ENG...
Страница 48: ...48 Dimensional drawings Pinion right hand...
Страница 49: ...49 Installation instructions EN Pinion left hand...
Страница 50: ...50 Pingvin right hand...
Страница 51: ...51 Installation instructions EN Pingvin left hand...
Страница 52: ...52 Pingvin XL right hand...
Страница 53: ...53 Installation instructions EN Pingvin XL left hand...
Страница 54: ...54 Pandion...
Страница 55: ...55 Installation instructions EN Pelican...
Страница 56: ...56 Pegasos...
Страница 57: ...57 Installation instructions EN LTR 2...
Страница 58: ...58 LTR 3...
Страница 59: ...59 Installation instructions EN LTR 4...
Страница 60: ...60 LTR 6 25 mm...
Страница 61: ...61 Installation instructions EN LTR 6 50 mm...
Страница 62: ...62 LTR 7...
Страница 63: ...63 Installation instructions EN Wiring digrams eWind basic wiring diagram...
Страница 64: ...64 eWind basic wiring diagram Pingvin XL Pegasos and LTR 7...
Страница 65: ...65 Installation instructions EN eWind basic external connections...
Страница 66: ...66 eWind basic internal connections...
Страница 67: ...67 Installation instructions EN eWind electrical heater 2kW...
Страница 68: ...68 eWind electrical heater 2kW...
Страница 69: ...69 Installation instructions EN eWind external electrical heater...
Страница 70: ...70 eWind electrical pre heater...
Страница 71: ...71 Installation instructions EN eWind extractor hood connections...
Страница 72: ...72 Principal diagrams eWind HW principle scheme ESW_PRINCIPLE_SCHEME dwg...
Страница 73: ...73 Installation instructions EN eWind CG principle scheme 1...
Страница 74: ...74 eWind CG principle scheme 2...
Страница 75: ...75 Installation instructions EN eWind CG principle scheme 3...
Страница 76: ...76 eWind CG principle scheme 4...
Страница 77: ...77 Installation instructions EN eWind CG principle scheme 5...
Страница 78: ...78 eWind CG connections...
Страница 79: ...79 Installation instructions EN eWind CHG principle scheme ground loop ES_CHG_PERIAATEKAAVIO_MAASILMUKKA dwg...
Страница 80: ...80 eWind CHG principle scheme heat exchanger...
Страница 81: ...81 Installation instructions EN eWind CW principle scheme...
Страница 84: ...84 eWind W Pingvin Pingvin XL LTR 3 eWind ELECTRICAL CABINET UNIT eWind_REV_A eWind W Pingvin Pingvin XL LTR 3...
Страница 88: ...88 eWind CHG CHG eWind ELECTRICAL CABINET UNIT eWind_REV_A eWind CHG...
Страница 89: ...89 Installation instructions EN eWind AGH eWind ELECTRICAL CABINET UNIT eWind_REV_A FG 02 M 02 eWind AGH...
Страница 93: ...93 Installation instructions EN...
Страница 94: ...94...
Страница 95: ...95 Installation instructions EN...