GS-IOB-230VAC Installation lnstructions
lnstalling the Circuit Breakers and Mechanical
Bypass Assembly
The simplest method to install these devices is to remove the main circuit breaker
bracket from the GSLC first. To remove the main bracket:
1. Remove the front cover (sometimes called the "front door") of the GSLC.
Open the door to 90 degrees and lift up about 1 /2" to disengage it from
the GSLC (see Figure 3).
2. Remove the interior cover (sometimes called the "dead front") of the
GSLC. Remove the six screws installed across the top and bottom of the
cover (see Figure 3) and take the interior cover off.
1
3. Remove the main circuit breaker bracket. Remove the four screws at the
top and bottom of the bracket (see Figure 3) and take it off.1
4. Remove the pre-installed screws in the circuit breakers before proceeding.
1
Star washers may be present under some of these screws. These must be reinstalled later
to ensure proper grounding of the enclosure.
4
900-0146·01-00 REVA
Содержание OutBack POWER ALPHA OUTBACK ENERGY GS-IOB-230VAC
Страница 7: ... ...