29
18.0 Wrap-Up
Thanks for choosing Energy Sentry
!
18.2
The Energy Sentry should be programmed with the proper
System Program in it.
18.3
Control/Display Unit should display Instantaneous, Av-
erage and Peak Kilowatt power readings. “Circuits On”
LED indicator lights should show which loads are enabled.
18.4
Relays in relay unit should be turning loads on and off as
necessary.
18.5
Replace the cover on the Energy Sentry and on the breaker
panel.
18.6
Turn to the back page of this manual. Record the following
information in the spaces provided:
•
Load control strategy selected.
•
Circuit or load assignments.
•
Load Priorities.
•
Minimum on/off times for all circuits if
changed, otherwise write zero.
•
Date of installation.
•
Name of Energy Sentry dealer or
installing electrical contractor.
•
Complete warranty card and drop in mail
to Brayden Automation Corporation.
Note:
Warranty card must be sent in for proper registra-
tion of unit. Warranty is not valid unless warranty card
has been received, and unit has been registered. Serial
number must be included on warranty card.
18.7
Leave the Owner's/Installation Manual in a convenient
location near the Control/Display Unit. If install is new
construction, place manual in kitchen drawer with
appliance manuals.
18.8
This concludes the installation of the Energy Sentry
9212
Series 3
Demand Controller.
18.1
The Energy Sentry Demand Controller unit should now
be ON and all breakers for loads controlled by the Energy
Sentry should also be ON.