
www.enerdrive.com.au
Page 7
2. INSTALLATION
2.1 CAUTION
•
Please read the entire installation instructions to get familiar with the installation steps before
installation.
•
Be very careful when installing the batteries, especially flooded lead-acid battery. Please wear
eye protection and have fresh water available to wash and clean any contact with battery acid.
•
Keep the battery away from any metal objects, which may cause short circuit of the battery.
•
Explosive battery gases may come out from the battery during charging, so make sure ventilation
condition is good - ensure proper ventilation is present.
• Ventilation is highly recommended if mounted in an enclosure. Never install the controller in a
sealed enclosure with flooded batteries! Battery fumes from vented batteries will corrode and
destroy the controller circuits.
• Loose power connections and corroded wires may result in high heat that can melt wire insulation,
burn surrounding materials, or even cause fire. Ensure tight connections and use cable clamps to
secure cables and prevent them from swaying in mobile applications.
• The controller can work with lead-acid battery and lithium battery within its specifications.
• Multiple same models of controllers can be installed in parallel on the same battery bank to
achieve higher charging current. Each controller must have its own solar panel(s).
• Installation must be completed in accordance with applicable local standards.
Содержание DOMETIC EN43510
Страница 28: ...NOTES Page 28 MPPT Solar Controller Owners Manual Rev 1 3...
Страница 29: ...NOTES www enerdrive com au Page 29...