Energy Guard - Assembly manual

9 - 2021

5.

Dynamic Load Balancing

5.1.

DLB system

Dynamic Load Balancing - DLB - is a smart system of
load management used during EV charging process. It
allows dividing the total input power between connec-
tors in a way, that allows maintaining consumption be-
low a given level. It helps to prevent surcharging net-
work of the charger’s operator with extra fees from an
electric power supplier. DLB also allows using avail-
able power, which appears after disconnecting any car
from the charger in the network. It can be used from
the quantity of just two connectors, up to couple of hun-
dreds of them, so it can be applied as well as in the
single household as well as in the whole parking lot.

In the basic version, an internet connection is not nec-
essary for DLB to work.

After energizing chargers,

they’ll know what to do.

Nevertheless, after fitting „master” unit in the Bridge
communication module and Enelion administration sys-
tem, you gain access to many developed functions al-
lowing remote management of charging.

5.2.

Energy Guard - impact on DLB

The combination of EnergyGuard with a network of
chargers allows the DLB functionality to be extended
to include other electrical devices than chargers in the
power distribution. From this point on, the connection
limitation will determine the total power allocated to the
building including chargers. The chargers will adjust the
charging power of the cars so that, together with other
electrical devices, the current limit of the connection will
not be exceeded.

When energy-consuming devices are turned on, the
Energy Guard, measuring the load, transmits the in-
formation about the current energy consumption to the
charging station, thanks to which there is a proportional
reduction of the available power for EV charging - there
is no risk of overloading the home electrical installation,
and thus triggering electrical protection.

Energy Guard can also be used in a network of charg-
ers (parking, shopping centres, fleet parking), which al-
lows you to use the full potential of the current supplied
energy, without increasing it - that is profitable and thus
valued by accountants in every company. During peak
hours, cars can be charged with the minimum required
power adequately distributed by Enelion’s charging ter-
minals. The undoubted advantage of using EEG is the
possibility of having a network of chargers with a total

power exceeding that available - having 22kW available
for chargers, we can have several 22kW chargers that
will always charge with the maximum available power.

Fig. 11: No DLB system

Fig. 12: Active DLB system

When the charging stations are connected to the inter-
net, system status can be monitored and managed via
the administration system Enelink.

5.3.

Configuration

Configuration can be done via DealerToolBox.

This

software is available on the manufacturer website. To
configure the network of chargers, it is necessary to
know the maximum current limit of the connection. Typ-
ically, this parameter corresponds to the tripping value
of the fuse protecting the connection in the switchgear.

Another configuration parameter is the location of the
EnergyGuard measurement in the switchgear. Energy-
Guard can be installed in two ways:

1. The measurement of the whole power network to-

gether with charger stations [Fig.4].

2. The measurement of the whole power network

without charger stations [Fig.5].

Ÿ

INFO

Information on the connection variants with dia-
grams can be found in the chapter

Design indi-

cations of the installation

.

11

Dynamic Load Balancing

Содержание Energy Guard

Страница 1: ...Energy Guard Assembly manual Enelion Sp z o o info enelion com...

Страница 2: ...Copyright Enelion Sp z o o The manual may change as the product develops The information provided may not be correct All rights reserved Revision V 1 1 Number of pages 16 Released September 24 2021...

Страница 3: ...Recommended power connection 6 3 2 Location selection criteria 6 4 Assembly 8 4 1 Mounting the device 8 4 2 Modification of the electrical switchboard 9 4 3 Controll after commissioning 9 4 4 FAQ 10 5...

Страница 4: ...ore installation please make sure that the module packages contain all the elements Up to date version of the operation manual can be accessed at http enelion com help Please note the contents of the...

Страница 5: ...dur ing its operation must comply with the legal standards in force in the place of assembly and the operation of the device The manufacturer is not liable for any dam age caused by an electrical inst...

Страница 6: ...ad balancing This allows for more effective use of the connection s power for charging vehicles INFO See User manual to learn more The manual contains detailed information on the functional ity and us...

Страница 7: ...n of it a wired connection be tween devices using a CAT 5 or CAT 6 Ethernet cable is required 3 2 Location selection criteria This device is designed to be installed inside of the electrical switchboa...

Страница 8: ...ar heat sources nor in the loca tions exposed to high humidity It is forbidden to install the device in explosion hazard zone Before installation make sure that the mounting space inside the switchboa...

Страница 9: ...of 500 m INFO Pay attention to communication bus termi antion both in Energy Guard and charg ing station Use termination for devices at the beginning and end of the network Termination is done by mov...

Страница 10: ...er source in the case that this branch would be disconnected for example by triggering its protection Fig 8 Sample connection of the voltage lines to the selected apparatus in the switchboard 4 2 Modi...

Страница 11: ...ources are connected to the electri cal system The measuring coils were installed frontside back The status LED flashes yel low Check the connection of the CAN bus wires The status LED is red Contact...

Страница 12: ...y consumption to the charging station thanks to which there is a proportional reduction of the available power for EV charging there is no risk of overloading the home electrical installation and thus...

Страница 13: ...current below 6 A per phase 1 4 kW single phase or 4 1 kW three phase charging If there is not enough power the charger goes into standby mode Charging will resume when minimum charging power is avail...

Страница 14: ...onal current measurement Yes Measurement point parameters Three or one phase system included correct amount of measuring coils Typical reaction time from switch on to change the charging power 1 5 s M...

Страница 15: ...the charging station 3 s of delay Mechanical data Housing Plastic PC ABS mountage on DIN rail IP protection Mountage inside the switchboard Maximum diameter of cables Depends on the measuring coils He...

Страница 16: ......

Страница 17: ...2021 ENELION Pana Tadeusza 50 80 123 Gdan sk Polska...

Отзывы: