Energy Guard - Assembly manual

9 - 2021

Ÿ

INFO

The Home version measuring coils, are
equipped in the necessary cables and
connector that should be plugged into the
EEG.
The Business version measuring coils,
are not equipped in the cables.

Sug-

gested cables with a conductor cross-
section of 0,5 mm

2

.

3. Voltage lines (power supply) EEG should be con-

nected under the order indicated in the diagram
[Fig.6]. The device does not require additional
protection. The cables on the switchboard side
should be connected to the terminals of the ap-
paratus located before branching the circuits in
the switchboard (e.g. a meter or the main pro-
tection - overcurrent switch). We suggest using
stranded type cables with a core cross-section of
0,5 mm

2

.

o

WARNING

A reliable and stable voltage source must
be provided.

Connecting the Energy

Guard voltage lines to a point constituting
a side branch of the installation may result
the loss of the power source in the case
that this branch would be disconnected,
for example by triggering its protection.

Fig. 8: Sample connection of the voltage lines to
the selected apparatus in the switchboard.

4.2.

Modification

of

the

electrical

switchboard

Since the Enelion Energy Guard has different
dimensions than the standard fuse which is in-
stalled in the switchboard, it is required to enlarge
the hole in the blend.

Fig. 9: EEG installed in the electrical switch-
board.

Ÿ

INFO

It is permissible to mount the EEG in other
orientations than directly on the DIN rail,
if required by the switchboard design.

4.3.

Controll after commissioning

After connecting the wiring and mounting the
EEG, the power can be restored. The EEG has a
very simple interface:

Fig. 10: LED interface on the front of the device.

Status led:

(a) Pulsing

blue

- correct state, charging does

not take place.

(b) Pulsing

green

- correct state, correct state,

ongoing charging at any device.

(c) Flashing

yellow

- No connection with the

charging station (CAN bus)

(d)

Red

- Fault/Damage

Phase diodes:

(a)

Red

- power consumption on a given phase

(b)

Green

- energy return on a given phase

9

Assembly

Содержание Energy Guard

Страница 1: ...Energy Guard Assembly manual Enelion Sp z o o info enelion com...

Страница 2: ...Copyright Enelion Sp z o o The manual may change as the product develops The information provided may not be correct All rights reserved Revision V 1 1 Number of pages 16 Released September 24 2021...

Страница 3: ...Recommended power connection 6 3 2 Location selection criteria 6 4 Assembly 8 4 1 Mounting the device 8 4 2 Modification of the electrical switchboard 9 4 3 Controll after commissioning 9 4 4 FAQ 10 5...

Страница 4: ...ore installation please make sure that the module packages contain all the elements Up to date version of the operation manual can be accessed at http enelion com help Please note the contents of the...

Страница 5: ...dur ing its operation must comply with the legal standards in force in the place of assembly and the operation of the device The manufacturer is not liable for any dam age caused by an electrical inst...

Страница 6: ...ad balancing This allows for more effective use of the connection s power for charging vehicles INFO See User manual to learn more The manual contains detailed information on the functional ity and us...

Страница 7: ...n of it a wired connection be tween devices using a CAT 5 or CAT 6 Ethernet cable is required 3 2 Location selection criteria This device is designed to be installed inside of the electrical switchboa...

Страница 8: ...ar heat sources nor in the loca tions exposed to high humidity It is forbidden to install the device in explosion hazard zone Before installation make sure that the mounting space inside the switchboa...

Страница 9: ...of 500 m INFO Pay attention to communication bus termi antion both in Energy Guard and charg ing station Use termination for devices at the beginning and end of the network Termination is done by mov...

Страница 10: ...er source in the case that this branch would be disconnected for example by triggering its protection Fig 8 Sample connection of the voltage lines to the selected apparatus in the switchboard 4 2 Modi...

Страница 11: ...ources are connected to the electri cal system The measuring coils were installed frontside back The status LED flashes yel low Check the connection of the CAN bus wires The status LED is red Contact...

Страница 12: ...y consumption to the charging station thanks to which there is a proportional reduction of the available power for EV charging there is no risk of overloading the home electrical installation and thus...

Страница 13: ...current below 6 A per phase 1 4 kW single phase or 4 1 kW three phase charging If there is not enough power the charger goes into standby mode Charging will resume when minimum charging power is avail...

Страница 14: ...onal current measurement Yes Measurement point parameters Three or one phase system included correct amount of measuring coils Typical reaction time from switch on to change the charging power 1 5 s M...

Страница 15: ...the charging station 3 s of delay Mechanical data Housing Plastic PC ABS mountage on DIN rail IP protection Mountage inside the switchboard Maximum diameter of cables Depends on the measuring coils He...

Страница 16: ......

Страница 17: ...2021 ENELION Pana Tadeusza 50 80 123 Gdan sk Polska...

Отзывы: