42
Maintenance
Tab. 8-1 Generator maintenance plan
8.2
Maintenance work
Only authorised specialist personnel are allowed to carry out maintenance
tasks. Execute all of the maintenance steps in the maintenance schedule
according to the following instructions.
CAUTION!
Certain surfaces on the device can get very hot whilst it is running.
Risk of burns
► Never touch any engine parts (in particular the exhaust system) for a few min-
utes after ceasing operation.
► Always leave hot engine parts to cool down before touching them.
NOTICE!
Also always read about the checking and maintenance work which con-
cerns the electrical safety of the generators in the chapter “Checking the
electrical safety“.
Disconnect the negative pole of the starter battery in order prevent unin-
tentional restarting of the engine whilst working on it (see Chapter 9.6.2).
Fuel lines
Check for cracks and damage;
replace if necessary
X
Check the protective conductor connection
once every 2 years
Maintenance work
Maintenance interval according to time
or operating hours [h]
Item
Maintenance step
Daily /
8h
After 3
months /
50h
After 6
months
/ 100h
Annual-
ly / 300h
Maintenance work should be performed by your service partner.
Содержание ESE 2300 i
Страница 1: ...ESE Power Generator TRANSLATION OF THE ORIGINAL OPER ATING MANUAL ESE 2300 i Article No 110 007...
Страница 34: ...35 Commissioning...
Страница 35: ...36 Commissioning NOTES...
Страница 57: ...58 Replacement parts NOTES...
Страница 58: ...59 Replacement parts NOTES...