52
ESE 807 / 1107 / 1307 / 1407 DBG (ES) DIN
Status at:
February 2013
Speed lowering in idle
5.3
Proceed as follows to operate the generator with idle down.
The following requirements must be met:
generator is ready for operation
generator has been started (see 4.4)
Fig. 5-3: Switching the idle down on pressure switch
Switch on idle speed reduction as follows:
Press
pressure switch
(Figure 5-3-(1))
until it engages (LED
lights up green).
Idle down is activated.
The idling speed reduction is active for about 5 minutes after
engine start and then lowers the rotational speed of the en-
gine, in as far as no load is engaged, to about 1800 rpm. The
engine speed will be increased to the nominal speed as soon
as a load is switched on. The engine always runs within the
nominal speed range if the rocker switch is in the "OFF" posi-
tion.
Switch the idle down off as follows:
Press the press switch again (LED goes out).
Idle down is switched off.
Requirements
Switching the idle down
on
ATTENTION
Switching idle down off
Содержание ESE 1107 DBG DIN
Страница 10: ...General information 10 ESE 807 1107 1307 1407 DBG ES DIN Status at February 2013 Notes ...
Страница 25: ...Status at February 2013 ESE 807 1107 1307 1407 DBG ES DIN 25 Notes ...
Страница 32: ...32 ESE 807 1107 1307 1407 DBG ES DIN Status at February 2013 Notes ...
Страница 47: ...Status at February 2013 ESE 807 1107 1307 1407 DBG ES DIN 47 Notes ...
Страница 72: ...72 ESE 807 1107 1307 1407 DBG ES DIN Status at February 2013 Notes ...
Страница 77: ...Status at February 2013 ESE 807 1107 1307 1407 DBG ES DIN 77 Notes ...