Appendix
51
11.4
Maintenance schedule
a0001911-en
Maintenance schedule for analyser no. ...................
weekly
Check and note calibration factor
is
c
( oiling, pump tubings, reagent, sample inlet etc.)
V ual heck s
done
cw 1
cw 2
cw 3
cw 4
cw 5
cw 6
cw 7
cw 8
cw 9
cw 10
cw 11
cw 12
date
date
date
date
date
2-weekly
Check concentration of the calibration factor in the laboratory.
If necessary, adjust c
use
oncentration in the menu parameter entry or
new standard.
Flush sample tubing system with pressurised water (disposable syringe). Remove hose holder unit from the pump.
date
date
date
monthly or if required
eplace re gents
R
a
.
lush the sample tu ing system with 12.5% bleaching lye (sodium hypochloride) and reflush thoroughly with
F
b
water ( enu Service V1: P, P1: , P2: , V2: S, (two channel version also V3))
m
g
s
heck sample collector for fouling and clean it if nec ssary
C
e
pray pump hoses with silicone spray
S
.
done
Jan
Feb
M r
Apr
Ma
Jun
Jul
Aug
Sep
O t
Nov
De
a
y
c
c
date
every rd
every th
3
month /
6
month
urn the pump
s in the hose holder unit
T
hose
(monthly)
, replace them
(
6
month)
every th
Attention:
Whenever working on the reagent hoses, the hoses must be removed from the canisters
and the T-connectors near the reagent pump to prevent contamination of the reagents.
lean drain lines
C
done
Jan
Feb
M r
Apr
Ma
Jun
Jul
Aug
Sep
O t
Nov
De
a
y
c
c
date
done
cw 13 cw 14
cw 15
cw 16 cw 17
cw 18
cw 19
cw 20
cw 21
cw 22
cw 23
cw 24
done
cw 49 cw 50
cw 51
cw 52 cw 53
done
cw 25 cw 26
cw 27
cw 28 cw 29
cw 30
cw 31
cw 32
cw 33
cw 34
cw 35
cw 36
done
cw 37 cw 38
cw 39
cw 40 cw 41
cw 42
cw 43
cw 44
cw 45
cw 46
cw 47
cw 48
done
cw 1
cw 3
cw 5
cw 7
cw 9
cw 11
cw 13
cw 15
cw 17
cw 19
cw 21
cw 23
done
cw 25 cw 27
cw 29 cw 31
cw 33
cw 35
cw 37
cw 39
cw 41
cw 43
cw 45
cw 47
done
cw 49 cw 51
cw 53
Содержание Stamolys CA71NO
Страница 2: ......
Страница 54: ...54...
Страница 56: ...www endress com worldwide BA355C 07 en 01 03 Printed in Germany FM SGML 6 0 DT 51517627...