Installation
RIA16
28
Hauser
a0011270
Fig. 4: Mounting the field indicator on a pipe with mounting bracket, steps c-d
Mounting kit, consisting of:
1:
Mounting plate
2:
Clamps for pipe mounting
3:
4 screws
3.4 Post-installation check
After installing the device, always run the following final checks:
Device condition and specifications
Notes
Is the device damaged?
Visual check
Is the sealing ring undamaged?
Visual check
Is the device fixed securely to the wall or mounting plate?
-
Is the front cover fixed tightly?
-
Does the device comply with the measurement point
specifications, such as ambient temperature, measurement
range etc.?
See Section 'Technical data'
Содержание RIA16
Страница 2: ......
Страница 56: ...www addresses endress com...