Proline Promass 84F, 84M
Hauser
53
Purge connections / secondary containment monitoring
"
Caution!
• The secondary containment is filled with dry nitrogen (N
2
). Do not open the purge connections unless the
containment can be filled immediately with a dry inert gas. Use only low gauge pressure to purge.
Maximum pressure: 5 bar.
• Purge connections or secondary containment monitioring can not be combined with separately available
heating jacket.
Promass F: (not available for the Promass F high-temperature version)
a0002537
Promass F DN 8 to DN 150
1 = Flow direction
a0009734
Promass F DN 250
G
L
L
H
45°
1
F
G
E
Z
Z
L
H
G
L
E
DN
F
G
H
L
8
AF 1"
½"-NPT
62
108
15
62
110
25
62
130
40
67
155
50
79
226
80
101
280
100
120
342
150
141
440
All dimensions in [mm]
Содержание Proline Promass 84F
Страница 69: ...Proline Promass 84F 84M Endress Hauser 69...
Страница 70: ...Proline Promass 84F 84M 70 Endress Hauser...
Страница 71: ...Proline Promass 84F 84M Endress Hauser 71...