Commissioning
Liquisys M CPM223/253
72
Hauser
6.4
Switching on
Familiarise yourself with the operation of the transmitter before it is first switched on. Please refer
in particular to the "Safety instructions" and "Operation" sections.
After power-up, the device performs a self-test and then goes to the measuring mode.
Now calibrate the sensor in accordance with the instructions in the "Calibration" section.
!
Note!
During commissioning, the sensors (except digital sensors) must be calibrated so that the measuring
system can return precise measurement data.
Then perform the first configuration in accordance with the instructions in the "Quick start-up"
section. The values set by the user are kept even in the event of a power failure.
The following function groups are available in the transmitter (the groups only available in the Plus
Package are marked accordingly in the functional description):
Setup mode
• SETUP 1 (A)
• SETUP 2 (B)
• CURRENT INPUT (Z)
• CURRENT OUTPUT (O)
• ALARM (F)
• CHECK (P)
• RELAY (R)
• SERVICE (S)
• E+H SERVICE (E)
• INTERFACE (I)
Calibration and offset mode
• CALIBRATION (C)
• NUMERIC (N)
• OFFSET (V)
!
Note!
A detailed explanation of the function groups available in the transmitter can be found in the
"System configuration" section.
Содержание Liquisys M CPM223
Страница 103: ...Liquisys M CPM223 253 Technical data Endress Hauser 103 ...
Страница 108: ...Appendix Liquisys M CPM223 253 108 Endress Hauser ...
Страница 111: ...Liquisys M CPM223 253 Endress Hauser 111 ...
Страница 112: ...www endress com worldwide BA194C 07 en 12 05 51500268 Printed in Germany FM SGML 6 0 DT 51500268 ...