Liquiline System CA80TP
Installation
Hauser
19
96 (3.78)
Ø
74 (2.91)
163,43 (6.43)
Ø 7 (0.28)
118 (4.65)
A0030527
11
Dimensions of the Y strainer. Engineering unit mm (inch)
Mounting the Y strainer on an even surface
1. Mount the Y strainer on the pipe clamps on an even surface. The Y strainer should be
aligned as illustrated in .
Sticking the adhesive fittings
2. Clean the adhesive surfaces (tube end on outside, sleeve or angle piece on inside) with a
cleaning cloth.
3. Allow the cleaned surfaces to dry for approx. 5 minutes.
4. Apply the glue evenly (closed adhesive layer) to the adhesive surfaces (first sleeve, then
pipe).
5. Join the parts together immediately (screw them together as far as possible).
6. Remove any surplus glue.
7. Allow the glued parts to harden for at least 24 hours before exposing the system to
sample.
Securing the sample hose
8. Turn the union nut to remove it.
9. Secure the threaded joint and ferrule supplied on the hose to the analyzer.
10. Screw the hose with the ferrule and threaded joint into the threaded borehole.
Содержание Liquiline System CA80TP
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ...www addresses endress com 71324945 71324945 ...