Installation
DTT31, DTT35
10
Hauser
3.4.2
Mounting instructions for installation in hygienic processes
a0011673-en
Fig. 8: Installation in hygienic processes
A
Milk pipe connection as per DIN 11851 (connection PL, PG, PH), only in linkage with EHEDG
certified and self centering ring
B
Varivent and APV-Inline (connection LB, LL, HL)
C
Clamp as per ISO 2852 (connection DB, DL)
"
Caution!
• Do not install in down pipes open towards the end.
• The sensor tip should never touch the pipe wall.
A0006978
Fig. 7: Incorrect installation!