Printer Server Installation 2-45
Display Lights (LEDs)
1)
When the printer server is powered up, the
green POWER LED will
illuminate.
2)
Wait 15 to 20 seconds after power is applied.
During this period, the printer server is performing its self test.
3)
If the network is active, the green NA LED will flash with network
activity.
4)
If any of the connected peripheral ports is active, the yellow PA LED will
flash showing port activity.
Figure 2-26: Display LED’s
Power
LED
PWR PA NA
CONFIGURATION STP UTP
Printer
Activity or PA
LED
Network Activity
or NA LED
Содержание NJ01B-NT+
Страница 1: ...User Guide for Emulex Printer Servers Version 5 0 ER2054618 00A...
Страница 20: ......