Printer Server Installation 2-31
Display Lights (LEDs)
1)
When the printer server is powered up, the
green POWER LED will
illuminate.
2)
Wait 15 to 20 seconds after power is applied.
During this period, the printer server is performing its self-test.
3)
If the network is active, the printer server yellow LAN LED will flash
with network activity.
4)
If the UTP connector is used, the green LINK LED will illuminate.
5)
If the BNC connector is used, the green LINK LED will not illuminate.
ETHERNET ADDRESS
00-00-C9-01-A0-6A
Power
(green)
LAN
(yellow)
UTP
(green)
Figure 2-20: Printer Server Display LEDs
Содержание NJ01B-NT+
Страница 1: ...User Guide for Emulex Printer Servers Version 5 0 ER2054618 00A...
Страница 20: ......