
31457-1-0513
Page 13
INSTALLATION
Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important
to allow for finished face when setting the depth of the frame.
See Figure 11.
3. Attach fireplace to frame using adjustable nailing flange. Preset
depth to suit facing material (adjustable to 3/8”, 1/2” or 3/4” depths).
NOTICE
: Fireplace must mount flush to facing material. If facing
material requires more depth than 3/4”, mark and drill two 1/8”
holes into fireplace side at appropriate depth. Bend standoff
tabs as needed to move fireplace flush with facing material.
See Figure 10.
4. Use eight 1/2” hex-head screws supplied in hardware package,
to screw through slotted holes in nailing flange and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of nailing flange to determine final depth.
Figure 10
Figure 11
Vent Pipe Clearance
NOTICE
:
Maintain one inch of clearance around top vent pipe.
See Figure 12.
For rear vent, maintain a minimum 1” clearance to
the bottom and sides of the vent, and 3” clearance to combustibles
above the vent pipe.
See Figure 13.
Figure 12 - Top Vent
Figure 13 - Rear Vent
NOTICE
:
When venting from the top of the fireplace, remove and
discard both insulation and retainer. See page 22.
Содержание DVP42DP31N-2
Страница 21: ...31457 1 0513 Page 21 Figure 32 Figure 33 Figure 34 EXAMPLES TOP VENT RUN...
Страница 37: ...31457 1 0513 Page 37 Figure 63 MILLIVOLT STANDING PILOT WIRING DIAGRAM...
Страница 58: ...31457 1 0513 Page 58 PARTS VIEW...
Страница 67: ...31457 1 0513 Page 67 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...